Helonic

Every check your team needs, in one platform

Helonic is an AI construction drawing analysis platform for teams evaluating Helonic drawing-review checks.

Clash Detection

Find coordination conflicts across disciplines automatically from 2D PDF drawings. No BIM required.

Code Compliance

Check drawings against IBC, ADA, fire codes, and egress requirements automatically.

RFI Generation

Turn detected issues into formatted RFIs with one click. Export or push to Procore.

Specification Analysis

Cross-reference drawings against specifications to catch material and requirement mismatches.

Revision Comparison

Compare drawing sets to identify changes between revisions, including unclouded modifications.

Schedule Verification

Verify door, window, and finish schedules match what is shown on floor plans.

Dimensional Verification

Automatically verify dimensions add up and match across sheets and details.

Fire & Life Safety Analysis

Check drawings for fire rating, egress, and life safety code compliance.

ADA Accessibility Checking

Verify ADA/ABA compliance in construction drawings automatically.

Sheet Index Validation

Verify sheet index matches actual drawing set. Catch missing or mislabeled sheets.

Annotation & Callout Detection

Find broken references, missing callouts, and orphaned annotations across sheets.

Drawing Set Completeness

Verify your drawing set is complete with all required sheets and information.

AI Submittal Review

Compare submittals against contract documents automatically for faster approvals.

Procore

Procore Integration

Push detected issues directly to Procore as RFIs, observations, or punch items.

Purpose-Built Construction AI

Our proprietary model, trained on construction drawings, delivers comprehensive issue coverage.

MEP Penetration Analysis

Detect unauthorized or conflicting MEP penetrations through structural elements.

Egress Path Compliance

Verify egress paths meet IBC requirements for travel distance, width, and dead ends.

Above-Ceiling Coordination

Coordinate MEP systems, lighting, and structural elements in the ceiling plenum.

Foundation Plan Review

Analyze foundation plans for coordination issues with utilities and structural elements.

Parking & ADA Compliance

Verify parking layouts meet ADA requirements and local zoning codes.

Building Envelope Analysis

Check building envelope details for continuity, thermal bridging, and waterproofing.

Vertical Alignment & Stacking

Verify vertical alignment of plumbing risers, shafts, columns, and walls across floors.

Detail Cross-Referencing

Verify all detail callouts reference existing details and vice versa.

Keynote & Legend Verification

Validate keynotes match legends and specifications across the drawing set.

Autodesk

Autodesk Construction Cloud

Sync projects and drawings directly from Autodesk Construction Cloud.

See every check on your drawings

Book a demo and we'll walk you through how each feature works on your actual drawings.