Helonic
Feature

Catch code violations before plan check

Reviewed by Manas GandhiOctober 2026Feature overview

Helonic is an AI construction drawing analysis platform for preconstruction teams using Helonic for code compliance.

Check construction drawings against IBC, ADA, fire codes, and egress requirements automatically.

Why does code compliance matter on the drawings?

A code miss caught at plan check delays the permit; the same miss caught in the field or after occupancy becomes a redesign or a lawsuit.

FigureWhat it measures
15-20%Reviews that are code corrections (ICC)
$75KAverage ADA settlement per lawsuit (DOJ)
3-6 moPermit delay from code issues
30%RFIs that are code clarifications (Navigant)

How does Helonic go from PDF upload to code findings?

Helonic reads every relevant sheet and surfaces violations with the exact code section so the designer can fix the citation, not guess.

  1. Upload your drawings. Drop your PDF drawing set into Helonic. We process architectural, life-safety, and code sheets at any size.
  2. AI extracts code-relevant data. Our model reads room names, occupancy types, door schedules, wall ratings, dimensions, and fixture counts.
  3. Cross-check against codes. Helonic compares your extracted data against IBC, ADA, fire, and egress requirements section by section.
  4. Code findings report. Receive specific findings with the code reference, the sheet where the issue appears, and a suggested fix.

Which building codes does Helonic check?

Helonic checks the code categories commercial projects cite most often, including IBC egress and occupancy, ADA, NEC, and NFPA fire protection.

ADA Accessibility

  • Door clearances and maneuvering space
  • Ramp slopes and handrail requirements
  • Restroom fixture clearances
  • Accessible route continuity
  • Signage and wayfinding

Fire & Life Safety

  • Fire-rated wall and door requirements
  • Fire barrier continuity
  • Smoke barrier requirements
  • Fire sprinkler coverage
  • Fire alarm device placement

Egress

  • Occupant load calculations
  • Exit width requirements
  • Travel distance limits
  • Common path of egress travel
  • Exit sign and lighting placement

IBC General

  • Occupancy classification consistency
  • Construction type requirements
  • Height and area limitations
  • Plumbing fixture counts
  • Ventilation requirements

Why does automated code review matter?

Manual code cross-referencing is slow and error-prone. Every miss turns into a plan check comment, a permit delay, or an accessibility lawsuit after occupancy.

Helonic does the cross-referencing automatically. Door clearances, exit widths, occupant loads, and fire ratings are checked against the relevant code section, with the sheet location attached to every finding.

Catch violations before plan check submission and document that code compliance was verified during design.

Frequently Asked Questions

Which building codes does Helonic check construction drawings against?
Helonic checks drawings against IBC, ADA, fire, and egress requirements, covering the categories commercial projects cite most often, including IBC egress and occupancy, ADA, NEC, and NFPA fire protection. On the IBC side that includes occupancy classification consistency, construction type, height and area limitations, plumbing fixture counts, and ventilation.
What information does Helonic pull from drawings to check code compliance?
Helonic reads room names, occupancy types, door schedules, wall ratings, dimensions, and fixture counts from architectural, life safety, and code sheets. It then compares that data against the relevant code requirements section by section.
Can Helonic check egress requirements on a drawing set?
Yes. Helonic checks occupant load calculations, exit widths, travel distance limits, common path of egress travel, and exit sign and lighting placement. These are the means of egress requirements covered in IBC Chapter 10, and they are where a lot of plan check comments come from.
Does Helonic check fire-rated walls and doors?
Yes. Helonic checks fire-rated wall and door requirements, fire barrier continuity, and smoke barrier requirements. It also reviews fire sprinkler coverage and fire alarm device placement as part of its fire and life safety checks.
What does a Helonic code compliance finding include?
Each finding includes the code reference, the sheet where the issue appears, and a suggested fix. That lets the designer correct violations before plan check submission and keep a record that code compliance was verified during design.
MG

Manas Gandhi

Co-founder & CTO, Helonic

Manas is the co-founder and CTO of Helonic, where he leads engineering and AI research for construction drawing analysis. He works directly with structural, MEP, civil, and fire protection engineers to translate the way they review drawings into AI systems that flag the issues that actually matter in the field. Before Helonic, he built machine learning pipelines for technical document understanding and has spent the last several years interviewing licensed design engineers and discipline leads to ground product decisions in real practice rather than industry assumptions.

Areas of focus
  • AI for technical document understanding
  • Cross-discipline coordination workflows
  • Code compliance automation (IBC, NEC, NFPA, IPC, IMC, ASCE)
  • Structural and MEP drawing review systems

How this page was researched: Code correction share from ICC, ADA settlement figure from DOJ, and code clarification share of RFIs from Navigant. Checks reference the IBC, the ADA, NEC, and NFPA fire protection requirements, including egress and life safety.

Last reviewed by Manas Gandhi · October 2026

Related Reading

See code compliance on your drawings

Upload your PDF set and we'll walk you through every IBC, ADA, fire, and egress finding our AI catches.