Helonic is built for 2D PDF clash and coordination review. Navisworks and Solibri still fit federated BIM when every trade has a coordinated model. This page shows what each approach catches and when to use both.
Helonic reads PDF construction documents for coordination and missing information. 3D clash detection in Navisworks or Solibri finds geometric interferences inside a federated BIM model.
Helonic analyzes PDF construction drawings to identify coordination issues, code violations, and missing information. Works with what contractors actually receive: 2D drawing sets.
Uses BIM models to find geometric conflicts where objects occupy the same space. Requires full 3D models from all trades coordinated in software like Navisworks.
Helonic catches document conflicts such as schedule mismatches and code misses. 3D analysis in Navisworks or Solibri catches precise geometry clashes that only exist in a coordinated model.
| Issue Type | 2D Analysis | 3D BIM |
|---|---|---|
| Duct through beam (geometric) | Partial | Excellent |
| Pipe elevation conflicts | Good | Excellent |
| Door schedule vs floor plan mismatch | Excellent | Poor |
| Spec vs drawing material conflicts | Excellent | None |
| Code compliance (ADA, fire, egress) | Excellent | Limited |
| Missing dimensions/notes | Excellent | None |
| 4D sequencing conflicts | None | Excellent |
| Maintenance clearance violations | Partial | Excellent |
| Cross-discipline coordination | Good | Excellent |
Most projects do not have complete, coordinated models from every trade, so the issued 2D set is still what gets built and still needs a review.
BIM clash detection only works when everyone models everything, and the models match reality.
On most projects, you get a mix: some trades have BIM models, others submit 2D shop drawings. The architect's Revit model is version 47 but the structural engineer is on version 43. The MEP subcontractor's model is gorgeous but does not match what they are actually installing.
Meanwhile, the construction documents are what you build from. The 2D PDFs are the legal contract documents. If they have conflicts, those conflicts show up in the field, regardless of what the BIM model says.
Smart teams use both approaches: BIM coordination during design to optimize layouts, and Helonic on the final documents to catch what slipped through.
Use 3D clash detection when quality models exist and routing must be optimized. Use Helonic on CD and IFC PDFs regardless of whether a model was ever built.
Most projects should use both: BIM coordination where models exist, then Helonic on each issued PDF set because those sheets are the contract documents.
Run BIM coordination during design development to optimize MEP routing
Use 2D analysis on each CD milestone (50%, 90%, IFC) to catch spec conflicts and code issues
Review shop drawings with 2D AI analysis before approving
Final 2D check on issued-for-construction documents
Manas is the co-founder and CTO of Helonic, where he leads engineering and AI research for construction drawing analysis. He works directly with structural, MEP, civil, and fire protection engineers to translate the way they review drawings into AI systems that flag the issues that actually matter in the field. Before Helonic, he built machine learning pipelines for technical document understanding and has spent the last several years interviewing licensed design engineers and discipline leads to ground product decisions in real practice rather than industry assumptions.
How this page was researched: This comparison is based on reviewing real projects where BIM models were partial, out of date, or unavailable, and on work with coordinators on what each method actually catches. It reflects how teams combine 2D document analysis with 3D model coordination across project phases.
Last reviewed by Manas Gandhi · August 30, 2026