Helonic
Feature

ADA compliance checking on 2D construction drawings

Reviewed by Manas GandhiOctober 2026Feature overview

Helonic is an AI construction drawing analysis platform for architects and preconstruction teams running ADA plan checks on 2D drawing sets.

Helonic runs an ADA plan check on the PDF drawing set before it goes to the building department. It reads the site plan, floor plans, enlarged toilet rooms, elevations, and door schedule together, and flags accessible route, door, ramp, toilet room, parking, and signage misses against the 2010 ADA Standards, ICC A117.1, and IBC Chapter 11.

Direct answer. Helonic checks 2D construction drawings for ADA compliance before permit submittal. It measures clear widths, door clearances, turning space, ramp slopes, grab bars, reach ranges, and parking counts on the PDF set, and cites the governing ADA, A117.1, or IBC section for each finding. No BIM model is needed.

What does Helonic check for ADA compliance?

Helonic checks the dimensional and scoping items that plan reviewers most often send back, each mapped to its section of the 2010 ADA Standards. ICC A117.1 and the ABA Standards cover the same items with closely matching technical criteria, and Helonic cites the standard your project is reviewed under.

Check2010 ADA sectionWhat gets measured on the drawings
Accessible route width403 Walking surfaces36-inch minimum clear width, passing spaces, and changes in level along the route
Door maneuvering clearance404 Doors, doorways, and gates32-inch clear opening and pull-side and push-side clearances for the approach drawn
Turning space304 Turning space60-inch circle or T-shaped space in toilet rooms, kitchens, and dwelling units
Ramps405 Ramps1:12 maximum running slope, 30-inch maximum rise per run, landings at top, bottom, and turns
Water closets and grab bars604 Water closets and toilet compartmentsCenterline distance from the side wall, clearance around the fixture, and side and rear grab bars
Reach ranges308 Reach rangesControls, dispensers, and operable parts within the 15-inch to 48-inch forward reach range
Parking counts208 Parking spacesAccessible spaces against the total provided, and one van space for every six accessible spaces
Parking space layout502 Parking spacesSpace and access aisle widths, van space dimensions, and aisle location on the accessible route
Signage703 SignsTactile room signs on the latch side of the door, at the mounting heights shown

Parking is covered in more depth under parking compliance, and clearances along exit paths under egress compliance. For the toilet room dimensions behind the 604 checks, see accessible toilet room clearances.

Which accessibility standards apply to my project?

Most projects fall under more than one accessibility standard, and Helonic checks against the ones you tell it apply.

  • 2010 ADA Standards for Accessible Design. The federal civil rights standard for public accommodations, commercial facilities, and state and local government buildings.
  • IBC Chapter 11 and ICC A117.1. The building code path the local plan reviewer enforces. IBC Chapter 11 sets scoping, and the adopted edition of A117.1 sets the technical criteria.
  • ABA Standards. The Architectural Barriers Act applies to facilities designed, built, altered, or leased with federal funds, such as federal offices and post offices.
  • State and local amendments. Some states, California among them, adopt their own accessibility chapter with stricter requirements. Give Helonic the project location and adopted codes so it checks the right edition.

Accessibility is one part of a full code review. The rest of the rule set is on code compliance checking, and the route rules are explained in the IBC accessible routes guide.

Do you need a BIM model for ADA compliance checking?

No. Helonic checks ADA compliance on the 2D PDF set, which is what the building department reviews and permits, not on a Revit or IFC model. Many teams searching for BIM accessibility checks do not have a coordinated model with every door, fixture, and grab bar modeled as an object, and the drawings are the contract documents either way.

Helonic on 2D drawingsBIM model checking
What gets checkedThe 2D PDF set: plans, enlarged plans, elevations, schedules, detailsA Revit or IFC model
Matches what is permittedYes. The AHJ reviews and stamps the drawing setOnly if the sheets were cut from a current model
Needs a coordinated modelNoYes, with rooms, doors, and fixtures modeled as objects
Catches notes and schedule conflictsYes, door schedules, fixture notes, and keynotes are read with the plansUsually not, rules run on geometry and properties
Typical userArchitects, GCs, owners, and plan reviewers before submittalBIM teams on projects with a maintained model

If you have a model, export the sheets and upload them. Helonic checks the dimensions and notes as they were issued. The broader tradeoff is covered in AI drawing review without BIM and 2D vs 3D clash detection.

What does an ADA finding look like?

Each ADA finding names the sheet, the element, the measured condition, and the section it fails.

  • The sheet and the location on it, highlighted on the drawing.
  • The element, such as a door, ramp run, water closet, or parking space.
  • What is drawn against what is required, for example a pull-side clearance drawn shorter than 404 requires for that approach.
  • The section of the 2010 ADA Standards, A117.1, or IBC Chapter 11 that governs it.

When a dimension needed for the check is not on the drawings, Helonic flags it as missing instead of guessing. Findings can go to Procore or Autodesk as RFIs. Architects use this as a QA/QC pass before issue, as described on Helonic for architects, and the pre-submittal plan review checklist shows where it fits.

Does Helonic replace a CASp or the plan reviewer?

No. Helonic is a check on the drawings before submittal, not a certification of compliance. The AHJ's plan review, field inspection, and a Certified Access Specialist (CASp) survey where one is required all still happen. The architect of record still owns the design and the stamp. What Helonic changes is when accessibility misses are found: on the drawings, before a plan check comment or a field fix.

Frequently Asked Questions

What does an ADA plan check on construction drawings look for?
Helonic checks the accessible items a plan reviewer looks for on the 2D set: accessible route widths, door maneuvering clearances, turning space, toilet room clearances and grab bars, ramp slopes and landings, reach ranges, parking counts and van spaces, and signage. Each finding names the sheet, the location, and the governing section of the 2010 ADA Standards, ICC A117.1, or IBC Chapter 11.
Do you need a BIM model for ADA compliance checking?
No. Helonic runs ADA compliance checking on the 2D PDF drawing set, which is the set the AHJ reviews and permits. It does not open Revit or IFC models. If your team has a model, you can still upload the sheets exported from it, and Helonic will check the dimensions and notes as drawn.
Which accessibility standards does Helonic check against?
Helonic checks against the 2010 ADA Standards for Accessible Design, IBC Chapter 11 with the edition of ICC A117.1 your jurisdiction has adopted, and the ABA Standards for facilities designed, built, altered, or leased with federal funds. State codes such as the California Building Code Chapter 11B add their own requirements, so tell Helonic the project location and adopted codes.
Does Helonic replace a CASp inspection or the plan reviewer?
No. Helonic is a pre-submittal check that catches drawn accessibility misses before the set goes to plan review. A Certified Access Specialist (CASp) inspection, the AHJ's plan review, and field inspection are still required, and the architect of record still owns compliance.
What is the best tool to analyze building accessibility compliance?
The right tool depends on what you have in hand. For a 2D drawing set before permit, Helonic checks the drawings against the ADA, A117.1, and IBC Chapter 11. For a coordinated IFC model, rule-based model checkers can run accessibility rule sets. For an existing building, a field survey by a CASp or accessibility consultant is the standard.
Which sheets should I upload for an ADA review?
Upload the site plan, floor plans, enlarged toilet room plans and interior elevations, door schedule, ramp and stair details, and the signage plan if there is one. Helonic reads them together, so a door clearance on the floor plan is checked against the hardware in the door schedule and a parking count is checked against the site plan.
MG

Manas Gandhi

Co-founder & CTO, Helonic

Manas is the co-founder and CTO of Helonic, where he leads engineering and AI research for construction drawing analysis. He works directly with structural, MEP, civil, and fire protection engineers to translate the way they review drawings into AI systems that flag the issues that actually matter in the field. Before Helonic, he built machine learning pipelines for technical document understanding and has spent the last several years interviewing licensed design engineers and discipline leads to ground product decisions in real practice rather than industry assumptions.

Areas of focus
  • AI for technical document understanding
  • Cross-discipline coordination workflows
  • Code compliance automation (IBC, NEC, NFPA, IPC, IMC, ASCE)
  • Structural and MEP drawing review systems

How this page was researched: Checks reference the 2010 ADA Standards for Accessible Design, including Section 208 for parking counts, 304 for turning space, 308 for reach ranges, 403 for walking surfaces, 404 for doors, 405 for ramps, 502 for parking spaces, 604 for water closets, and 703 for signs. Projects under the IBC are also checked against Chapter 11 and the adopted edition of ICC A117.1, and federal facilities against the ABA Standards.

Last reviewed by Manas Gandhi · October 2026

Related Reading

Run an ADA plan check on your next set

Upload the site plan, floor plans, and enlarged toilet rooms, and see the accessibility misses Helonic finds before plan review does.