Permit set checklist: what a building department expects

A permit set is the package of permit drawings and documents a building department reviews before it issues a building permit. Most departments expect a cover sheet with a code analysis, a life safety plan, a site plan, architectural, structural, and MEP sheets sealed by the design professionals, plus calculations, reports, energy forms, and a deferred submittals list.

Helonic checks permit drawings against the model codes (IBC, NEC, NFPA, and ADA) before submission.

Last reviewed October 2026 by Milind Sagaram

The permit set checklist by sheet group

Use this table to confirm the set is complete before it goes in. Requirements vary by authority having jurisdiction, so treat this as the baseline and add the local department's own checklist on top.

Sheet groupWhat the department expectsCommon gap
Cover sheet and code analysisProject name and address, sheet index, applicable codes and editions, occupancy, construction type, allowable and actual area and height, sprinkler status, occupant load, and egress capacity.The code analysis says one thing and the plans show another.
Life safety planOccupant load per room, exits and exit capacity, travel distance, common path, rated walls and doors, and sprinkler and fire alarm coverage notes.Travel distance drawn to the wrong exit, or rated walls that don't match the wall types.
Site planNew and existing buildings to scale, distances to lot lines, grades, accessible route from the public way, parking and accessible stalls, utilities, and flood zone where applicable.No dimensioned setback, or no accessible route shown from parking to the entrance.
Architectural plans, elevations, sections, wall sectionsDimensioned floor plans, roof plan, exterior elevations, building and wall sections, wall types with rated assembly listings, door and window schedules.Wall type tags that reference an assembly listing nobody included.
Accessibility detailsEnlarged toilet rooms, clear floor spaces, reach ranges, ramp and stair details, signage, and accessible counters.Plans show a compliant room, but the enlarged plan has no dimensions to prove it.
StructuralDesign criteria (codes, loads, wind, snow, seismic, soil values), foundation and framing plans, details, and a statement of special inspections.Design criteria missing or citing a different code edition than the cover sheet.
Mechanical, plumbing, electricalEquipment schedules, ventilation and plumbing fixture calcs, one-line diagram, panel schedules, load calculations, and energy compliance forms.Energy forms that don't match the scheduled equipment or lighting.
Fire protectionSprinkler and fire alarm scope on the design set; full drawings and hydraulic calcs, often as a deferred submittal.Deferred without being listed on the cover sheet.
Seals and signaturesSeal and signature of the responsible architect or engineer on each sheet they prepared, per state licensing law.A consultant sheet added late without a seal.
Project dataOwner, design team and contacts, scope of work, parcel number, zoning, and valuation where the department asks for it.Scope of work that doesn't describe everything the drawings show.
Deferred submittals listEvery item to be submitted later, such as sprinklers, fire alarm, trusses, or curtain wall, identified on the set for building official approval.A deferred item shown on the drawings but missing from the list.
Supporting documentsStructural calcs, geotechnical report, energy compliance documentation, and any reports the department or zoning approval calls for.Geotech values on the structural sheets that don't match the report.

This page covers what the set has to contain. For the quality pass that checks whether those sheets are right, use the pre-submittal plan review checklist. If you need a refresher on what each sheet type is, see types of construction drawings.

What does the code analysis on the cover sheet need?

The code analysis is the first thing most plan reviewers read, and every later comment traces back to it. It usually sits on the cover sheet or a G-series sheet and lists:

  • Codes and editions. Building, fire, mechanical, plumbing, electrical, energy, and accessibility codes, with the edition and local amendments the jurisdiction has adopted.
  • Occupancy classification. Each occupancy group and how mixed uses are handled (separated or nonseparated). See IBC occupancy classification.
  • Construction type. Type I through V with the A or B subtype, and the required ratings for structural elements. The construction types guide lists them.
  • Area and height. Allowable versus actual building area, height in feet, and number of stories, including any frontage or sprinkler increases taken.
  • Sprinkler status. Whether the building is sprinklered throughout and under which NFPA standard, since many allowances depend on it.
  • Occupant load. Per floor and per room, with the load factors used. See how to calculate occupant load.
  • Egress summary. Required and provided exits, egress width, and maximum travel distance.

IBC Section 107 sets the baseline for construction documents. Section 107.2.3 requires the means of egress to be shown in enough detail, with occupant loads on every floor for most occupancies, and Section 107.2.6 requires a site plan drawn to scale.

Which sheets need the most care before submittal?

The life safety plan and the structural design criteria summarize decisions the rest of the set has to match, so a mistake on either one turns into comments on sheets that were otherwise fine. The life safety plan guide explains what a reviewer expects on that sheet.

On the structural sheets, IBC Section 1603 lists the design loads and data the construction documents must show: dead and live loads, wind, snow, seismic, flood, and soil values. The statement of special inspections required by IBC Section 1704 usually goes on the structural general notes or as a separate document. If the soil values come from a geotechnical report, the report goes in the submittal. The geotechnical report basics page covers what those values are.

On MEP sheets, energy compliance is the frequent gap. Commercial projects typically include IECC or ASHRAE 90.1 compliance forms (often from DOE's COMcheck) for envelope, mechanical, and lighting. See ASHRAE 90.1 energy compliance basics.

How should deferred submittals be listed?

IBC Section 107.3.4.1 lets the building official approve deferral of parts of the design, but the design professional in responsible charge has to list them on the permit set. Common deferred items include fire sprinkler and fire alarm drawings, pre-engineered trusses, curtain wall, and stair or guard systems designed by the fabricator.

  • List every deferred item on the cover sheet or the code analysis sheet.
  • Name who will design and submit each one.
  • Show the design criteria the deferred item has to meet, such as loads for trusses or hazard classification for sprinklers.
  • Note that deferred work can't be installed until its documents are approved.

The deferred submittals guide covers fees, review timing, and how deferred items cause field conflicts when nobody coordinates them.

What does the title block need on permit drawings?

Each sheet's title block should carry the project name and address, sheet number and title, issue date and revision history, the firm, and the seal and signature of the responsible professional. Many departments also want the issue purpose marked, such as “Permit Set” or “Plan Check Resubmittal 1.”

The sheet index on the cover has to match the sheets in the set, including titles. The title block guide covers each field.

Do permit set requirements vary by jurisdiction?

Yes. Every authority having jurisdiction adopts a code edition, adds local amendments, and sets its own submittal rules. Many publish a submittal checklist listing required forms, sheet sizes, electronic file naming, and which reports they want. Some require fire department review in parallel, and some want zoning or planning approval first.

Pull the local checklist before you assemble the set. The plan check by city pages list the permit authority, adopted code, and known amendments for major US cities.

What happens after the permit set is submitted?

The department reviews the set and issues comments by discipline. Answer them with a response letter and clouded revisions. The guide to responding to plan check comments covers the letter format and why some sets go to a third round.

The permitted set is rarely the set crews build from. The permit set vs IFC set article explains what changes between them, and how to review construction drawings covers the review that follows.

How does Helonic check a permit set?

Helonic reads the permit drawings and checks them against the model codes, including IBC, NEC, NFPA, and ADA requirements. It flags issues like a code analysis that doesn't match the plans, egress that falls short of the occupant load, and missing accessibility dimensions, each with the sheet and location. The code compliance feature lists what it checks.

Scope note

Helonic checks the model codes and state and local adopted codes, such as the California Building Code, but not a department's own submittal rules. A licensed reviewer confirms those, and the design professional of record decides what changes.

Practitioner insight

“The comment I write most on a first submittal is that the code analysis doesn't match the plans. The cover says sprinklered, Type V-A, and the life safety plan is laid out like it isn't sprinklered at all. I can't review egress until they fix that.”

Conversations with municipal plan reviewers and permit expediters on commercial tenant improvement and mid-rise submittals.

Permit Set FAQs

What drawings are required for a building permit?
Most building departments expect a cover sheet with a code analysis, a life safety plan, a site plan, architectural plans, elevations, and sections, accessibility details, structural drawings with design criteria, and mechanical, electrical, plumbing, and fire protection drawings. Calculations, reports, and energy compliance forms go with the drawings. The exact list depends on the authority having jurisdiction and the project scope.
What is the difference between a permit set and construction drawings?
A permit set is the version of the construction documents submitted to the building department to show code compliance. The IFC or construction set that follows adds coordination, details, and changes the contractor needs to build. The two often differ by addenda, plan check revisions, and deferred submittals.
Do permit drawings need to be stamped?
In most jurisdictions, yes, for commercial work. Sheets prepared by a licensed architect or engineer carry that professional's seal and signature, as state licensing law requires. Some small residential projects can be submitted without a seal. Check the state board rules and the local department's submittal requirements.
What is a code analysis on a permit set?
A code analysis is a summary, usually on the cover sheet or a dedicated G-series sheet, of the codes and editions that apply, occupancy classification, construction type, allowable and actual area and height, sprinkler status, occupant load, and egress capacity. Reviewers start there and check that the plans match it.
Can fire sprinkler drawings be submitted after the permit?
Often, yes. Many jurisdictions accept fire sprinkler and fire alarm drawings as deferred submittals reviewed after the main permit. The deferral has to be listed on the permit set and approved by the building official, and the deferred items can't be installed until their documents are approved.
Why do permit requirements differ between cities?
Each authority having jurisdiction adopts a model code edition and adds local amendments, and many publish their own submittal checklists. Two cities on the same IBC edition can still require different forms, sheet content, or deferred submittal rules.
MS

Milind Sagaram

Co-founder & CEO, Helonic

Milind is the co-founder and CEO of Helonic, where he leads product and go-to-market for AI-powered construction drawing analysis. He works closely with general contractors, project managers, estimators, and owners to understand how drawing quality drives project outcomes - and where AI can reduce RFIs, change orders, and rework. Milind has interviewed hundreds of construction professionals across project delivery roles, from preconstruction estimators at ENR top-400 contractors to facilities directors at institutional owners, and uses those conversations to shape both product direction and the way Helonic talks about the work.

Areas of focus
  • Construction project delivery and preconstruction
  • RFI and change order economics
  • Owner and GC workflows for drawing QA/QC
  • Estimating risk and bid-stage scope assessment

How this page was researched: Requirements were checked against IBC 2021 Section 107 (construction documents, including 107.2.3 means of egress, 107.2.6 site plan, and 107.3.4.1 deferred submittals), Section 1603 (structural design criteria), and Section 1704 (statement of special inspections).

Last reviewed by Milind Sagaram · October 2026