Helonic is an AI construction drawing analysis platform for teams researching construction types guide during drawing review. Understanding the five construction types, fire-resistance requirements, and allowable heights/areas.
Type of Construction classifies buildings based on the fire resistance of their structural elements. The IBC defines five main types (I through V), each with varying levels of fire protection. Higher numbers generally mean less fire resistance.
According to NFPA fire data, Type V (wood frame) buildings account for approximately 65% of all U.S. building fires but represent only 40% of fire-related property losses due to their smaller average size. Type I and II buildings, while less fire-prone, average $750,000 in damage per fire incident compared to $45,000 for Type V structures.
IBC Table 601 sets fire-resistance ratings for structural frame, exterior walls, and floors by construction type, from Type I-A down to Type V-B.
| Type | Frame | Ext. Walls | Floors | Roof | Int. Bearing | Examples |
|---|---|---|---|---|---|---|
| Type I-A | Noncombustible | 3 hr | 2 hr | 1½ hr | 1 hr | High-rise buildings, hospitals |
| Type I-B | Noncombustible | 2 hr | 2 hr | 1 hr | 1 hr | Mid-rise buildings, schools |
| Type II-A | Noncombustible | 1 hr | 1 hr | 1 hr | 1 hr | Low-rise commercial, retail |
| Type II-B | Noncombustible | 0 hr | 0 hr | 0 hr | 0 hr | Warehouses, some retail |
| Type III-A | Ext. noncombustible, Int. any | 2 hr | 1 hr | 1 hr | 1 hr | Older mixed-use, apartments |
| Type III-B | Ext. noncombustible, Int. any | 2 hr | 0 hr | 0 hr | 0 hr | Small commercial |
| Type IV | Heavy Timber | 2 hr | HT | HT | 1 hr / HT | Mill construction, mass timber |
| Type V-A | Any material | 1 hr | 1 hr | 1 hr | 1 hr | Protected wood frame residential |
| Type V-B | Any material | 0 hr | 0 hr | 0 hr | 0 hr | Unprotected wood frame, single-family |
HT = Heavy Timber. Based on IBC Table 601.
IBC construction types I through V are distinguished by whether the structure is noncombustible and how much fire resistance those elements must have.
Highest level of fire protection. Structural elements are noncombustible (steel, concrete) with fire-resistive protection. Used for high-rise buildings, hospitals, and buildings requiring maximum occupant protection.
Structural elements are noncombustible but may or may not have fire-resistive protection. Type II-A is protected; Type II-B is unprotected steel or concrete. Common for commercial and industrial buildings.
Exterior walls are noncombustible (typically masonry or concrete); interior structure can be any material including wood. Common for "ordinary" construction like older commercial buildings.
Exterior walls are noncombustible; interior uses heavy timber (large wood members). The mass of heavy timber provides inherent fire resistance through charring. Now includes mass timber (CLT, glulam).
Any materials permitted including light wood frame. Type V-A has 1-hour protection; Type V-B is unprotected. Most residential construction is Type V-B.
Height and area limits can increase with sprinklers, frontage, and some mixed-occupancy calculations allowed by the IBC.
NFPA 13 sprinklers can increase stories by 1 and area by 200-300%
Open perimeter access for firefighting can increase area up to 75%
Certain combinations of sprinklers, frontage, and low-hazard uses allow unlimited area
Both Type I-A and I-B are noncombustible construction, but Type I-A provides higher fire resistance ratings: 3-hour structural frame and exterior bearing walls vs. 2-hour for Type I-B. Type I-A is required for the tallest buildings (unlimited height when sprinklered), while Type I-B has a maximum height of 180 feet (12 stories) for most occupancies.
Yes. Type III construction requires noncombustible exterior walls only; interior structural elements can be any material including wood framing. This is common in older "mill construction" buildings with masonry exteriors and wood interior framing. The key requirement is that exterior walls be noncombustible (typically masonry, concrete, or steel).
NFPA 13 sprinklers provide significant increases per IBC Section 504.2 and 506.3: typically one additional story, 20 additional feet in height, and a 200-300% increase in allowable area per floor. For example, a Type V-A building (normally limited to 60 feet) can reach 80 feet when fully sprinklered.
Note: Local jurisdictions may have amendments to the IBC. Always verify requirements with your Authority Having Jurisdiction (AHJ).
Related references for code compliance, occupancy, and fire-rated assemblies.