Helonic is an AI construction drawing analysis platform for people check exterior areas for assisted rescue during plan review. The landing size and the door swing have to fit outside the exit door the architectural plan shows
An exterior area for assisted rescue passes review when the landing outside the exit door holds the required wheelchair spaces, the wall behind it has the rating IBC Section 1009.7 requires, the area is open to the air, and the stair down from it is at least 48 inches between handrails. Helonic checks that the landing fits at each exit door. It is required where an exit on the level of exit discharge has no accessible route to a public way. The landing usually fails because the door swing and the stair take the space the wheelchair needs.
IBC Section 1009 requires one where the exit discharge does not include an accessible route from an exit on the level of exit discharge to a public way. In plain terms: the door is at grade level, but steps stand between it and the sidewalk.
Typical cases are a side door that opens onto a stoop with steps, a door on a sloping site, and a courtyard where stairs are the only way out. If the accessible route reaches the public way, the exterior area is not needed.
| Requirement | What it means on the drawing |
|---|---|
| Size | One 30 by 48 inch wheelchair space per 200 occupants, sized like an area of refuge, outside the exit discharge width. |
| Wall rating | The exterior wall behind the area is rated at least 1 hour, extending 10 feet beyond the area on each side and from the ground to the roof line or 10 feet above the area floor, whichever is lower. Openings in that wall are protected. A fully sprinklered building is exempt from the rating. |
| Openness | The sides are at least 50 percent open, with the openings spread out so smoke does not collect. |
| Stair | The exterior exit stair serving the area is at least 48 inches clear between handrails. |
| Signage | A sign identifies the area, like the signs at an area of refuge. |
Sizing works the same way as an interior refuge. See area of refuge size and stair landing fit for the count.
The exit door swings out over the landing, in the direction of egress. The wheelchair spaces have to sit beyond that swing and outside the path to the stair. The stair then needs its own top landing at full width. A stoop drawn just big enough for the door rarely fits all three.
Grading changes are the usual cause. The site work side of this is covered in curb ramp slope on site plans, and stair geometry is in stair design requirements.
Reading the civil and architectural sheets at the same door is one of the cross-discipline checks in how to review construction drawings.
Check the civil plan at every exit door the architectural plan shows with steps. When grades drop after the architectural plan is set, a door that had an accessible route in schematic design often ends up needing an exterior area for assisted rescue.
Helonic compares the architectural plans, the civil grading plan, and the elevations at each exit door. It flags a door with steps to the public way and no exterior area, a landing too small for the wheelchair space beyond the door swing, and a stair under 48 inches. The accessibility checks cite the sheet and the grid for each finding.
Findings are decision support. The architect decides what changes. For how this review fits a project, see AI for construction drawings.
Practitioner insight
“Grading drops two feet late in design development, the civil plan adds three steps at the side door, and the architectural plan never adds the landing or the wider stair.”
Common finding in site and accessibility coordination review.
Manas is the co-founder and CTO of Helonic, where he leads engineering and AI research for construction drawing analysis. He works directly with structural, MEP, civil, and fire protection engineers to translate the way they review drawings into AI systems that flag the issues that actually matter in the field. Before Helonic, he built machine learning pipelines for technical document understanding and has spent the last several years interviewing licensed design engineers and discipline leads to ground product decisions in real practice rather than industry assumptions.
How this page was researched: Requirements were checked against IBC 2021 Section 1009 for accessible means of egress at the level of exit discharge and Section 1009.7 for exterior area size, separation, openness, and stair width.
Last reviewed by Manas Gandhi · October 9, 2026
Related references for accessible means of egress review.
The interior version and its wheelchair space count.
When an accessible route reaches the public way.
Where site grading breaks the accessible route.
Stair width, landings, and handrails.
Accessibility requirements across the drawing set.
A systematic approach to catching drawing errors before construction.