AI drawing review for code consultants
Helonic is an AI construction drawing analysis platform for code consultants who review 2D PDF drawing sets.
Screen drawings against multiple building codes, fire and life safety standards, and accessibility requirements automatically.
What slows down code consultants?
Code consultants lose hours reconciling IBC, NFPA, ADA, and energy-code requirements that sit on different sheets and revisions.
- Complex Multi-Code Compliance. Projects must comply with IBC, local amendments, NFPA, ADA/ICC A117.1, and energy codes simultaneously, each with overlapping and sometimes conflicting requirements.
- Evolving Standards. Code cycles update every three years, with local jurisdictions adopting different editions and amendments that change review criteria.
- High Volume Reviews. Each project requires systematic review across dozens of code sections, making it difficult to maintain thoroughness under tight deadlines.
How does Helonic help?
Helonic screens the full set against common IBC, NFPA, ADA, IECC, and ASHRAE checks so reviewers start from a documented punch list.
The screening draws on code compliance checking, egress compliance, and ADA accessibility checking, and each finding cites the code section behind it.
- Multi-Code Compliance Screening. Automatically screen drawings against IBC, NFPA, ADA, and energy code requirements in a single pass. Flag potential violations with specific code section references.
- Fire and Life Safety Comprehensive Review. Verify fire-rated assemblies, egress widths and travel distances, area of rescue assistance locations, fire separation distances, and sprinkler coverage against NFPA 13 and IBC Chapter 9.
- Accessibility Audit. Check accessible routes, door clearances, restroom layouts, signage, and parking against ADA Standards and ICC A117.1 to catch non-compliant conditions before permit submission.
- Energy Code Pre-Check. Review envelope details, fenestration ratios, and mechanical system specifications against IECC or ASHRAE 90.1 requirements to flag energy code gaps early in design.
- Occupancy Classification Verification. Confirm that occupancy classifications, construction types, and allowable areas are consistent throughout the drawing set and meet code requirements for the proposed use.
What issues does Helonic catch?
Helonic flags egress width shortfalls, occupancy mismatches, fire-separation gaps, and accessibility misses that delay permit.
Egress & Fire Safety
- Egress width deficiencies at corridors and stairwells
- Fire rating gaps in walls, floors, and shaft enclosures
- Dead-end corridor violations exceeding allowable length
- Missing or incorrect fire damper locations at rated assemblies
Accessibility & Energy
- ADA non-compliance in restrooms, routes, and parking
- Energy code violations in envelope and fenestration design
- Occupancy load calculation errors affecting egress design
- Incomplete code analysis on cover sheets
What return do code consultants see with Helonic?
Code teams finish first-pass reviews faster and send fewer incomplete comments because the obvious gaps are already listed.
| Figure | What it measures |
|---|---|
| 50% | Faster initial code compliance screening per project |
| 95% | Code coverage across IBC, NFPA, and ADA sections |
| Consistent | Review quality maintained across your team |
Frequently Asked Questions
How does Helonic support a code consultant's review?
Which codes and standards does it cover?
Does it handle local amendments?
Can it produce a documented issue list for the AHJ?
Manas Gandhi
Co-founder & CTO, HelonicManas is the co-founder and CTO of Helonic, where he leads engineering and AI research for construction drawing analysis. He works directly with structural, MEP, civil, and fire protection engineers to translate the way they review drawings into AI systems that flag the issues that actually matter in the field. Before Helonic, he built machine learning pipelines for technical document understanding and has spent the last several years interviewing licensed design engineers and discipline leads to ground product decisions in real practice rather than industry assumptions.
- AI for technical document understanding
- Cross-discipline coordination workflows
- Code compliance automation (IBC, NEC, NFPA, IPC, IMC, ASCE)
- Structural and MEP drawing review systems
How this page was researched: Code checks reference IBC, NFPA, ADA/ANSI A117.1, and local amendment workflows code consultants apply. Examples reflect the code items Helonic most often flags across drawing sets.
Last reviewed by Manas Gandhi · August 9, 2026