Autodesk Forma Workflows
Helonic is an AI construction drawing analysis platform for people comparing AI tools for Autodesk Forma Workflows. Autodesk's own AI plus the outside reviewers that connect to Autodesk Forma, sorted by what each one does to the drawing set.
Published · Updated
In March 2026 Autodesk renamed Autodesk Construction Cloud to Autodesk Forma. Docs is now Forma Data Management, and Autodesk Build is now Forma Build. Most teams still say ACC. Autodesk has added AI across Forma. Some of it searches drawings, some compares revisions, and some drafts RFIs. The how-to version of the Helonic workflow is Autodesk Construction Cloud drawing review.
Full-set review that pushes found issues back as RFIs
Helonic syncs projects and drawings directly from Autodesk Forma (formerly Autodesk Construction Cloud) and reviews every sheet for 10 issue categories, including coordination, code compliance, structural, MEP, and accessibility. Every finding has a severity rating and exact page coordinates. The Autodesk integration can push the issues it finds back into Forma as RFIs, and the same workflow runs on Procore projects.
Best for: Teams on Autodesk Forma who want a coordination and code pass on the issued PDFs today
Drawing search and revision comparison
Autodesk Assistant searches inside drawings and takes you to the relevant sheet, and it answers questions over specs, RFIs, issues, and submittals. Drawing Change Analysis, in beta, shows what changed between revisions and where. Autodesk's Drawing Compliance Review, which checks packages against codes and owner requirements, is planned for early 2027.
Best for: Finding information and comparing revisions without leaving Autodesk
Risk scoring on project data
Construction IQ uses machine learning to rank design, quality, safety, and RFI risks from the issues, checklists, and RFIs already in the project. RFI Risk Factors classifies RFIs by root cause, discipline, and building component. It works from records the team has already logged.
Best for: Project leaders deciding which logged issues and RFIs to chase first
Drafting and an RFI-needed check
Forma Build (formerly Autodesk Build) can draft an RFI from a text prompt, filling the title, question, discipline, priority, and impact fields for review. Its RFI AI Agent searches the project's specifications and closed RFIs and tells you whether an RFI is needed. Both start from a question someone already has.
Best for: Project engineers writing RFIs faster inside Forma Build
Human-validated review pushed to Forma
Buildcheck reviews 2D PDF sets across disciplines with expert validation on each finding, and since September 2026 it pushes those comments directly into Autodesk Forma. Buildcheck quotes 5 to 10 days per review.
Best for: Teams that want a person to validate each comment before it reaches Autodesk Forma
RFI checks and bulletin changes
Trunk Tools has an Autodesk App Store app for Forma Build. TrunkRFI checks draft RFIs against specs, drawings, and past answers before submission, and TrunkReview flags changes across drawing revisions with an overlay and written notes.
Best for: Cutting duplicate RFIs and tracking bulletin changes on Autodesk Forma projects
Model coordination with Forma sheets
Revizto runs clash detection and issue tracking on federated models, and it can pull sheets from Autodesk Forma as a connected document source. Sheets can be overlaid on the model next to clash results. It covers what has been modeled, not unmodeled consultant scope.
Best for: VDC teams coordinating models on Autodesk Forma projects
Markup sync through a third-party connector
ARKANCE's Be.Smart Connector moves PDFs from Forma Data Management and Sheets into Bluebeam Studio Sessions or Projects and syncs markups back, with slip sheeting across revisions. It is a third-party app, and reviewers in the session still find every issue by hand.
Best for: Teams that mark up in Bluebeam but keep files in Autodesk Forma
Helonic connects to Autodesk Forma, formerly Autodesk Construction Cloud, through its Autodesk integration and syncs projects and drawings directly. No BIM model or Revit is required, because the review runs on the 2D PDFs your team already issued.
The integration can push the issues Helonic finds back into Autodesk Forma as RFIs, built from the located finding on the sheet. Setup details are on the Autodesk integration page.
Autodesk's AI searches drawings and compares revisions today, and full compliance review is planned. Autodesk Assistant finds sheets and answers questions, and Drawing Change Analysis is in beta. Drawing Compliance Review is scheduled for early 2027, and Autodesk says professional review remains part of the process.
Until that ships, a coordination and code pass on the full set needs a separate reviewer. Helonic vs Autodesk Assistant compares the two on the drawing job, and Autodesk Assistant alternatives lists other options.
Forma Build, formerly Autodesk Build, stays the project record for RFIs, issues, and submittals. A reviewer like Helonic reads the drawings and can push the issues it finds into that record as RFIs.
Construction IQ and the RFI AI work on records that already exist, so they help after the issue has been logged. The platform-level comparison is Helonic vs Autodesk Build.
Test on one issued set you already know well. Count real findings, false positives, and time from upload to a list you can act on.
Then check what lands in Autodesk Forma: an RFI, an issue, or a marked-up PDF. Helonic can push the issues it finds back as RFIs, with the sheet reference attached. Also check whether the tool works on Procore jobs if your company runs both. The sister page is best AI drawing review for Procore.
Helonic syncs drawings from Autodesk Forma, reviews the full set, and can push the issues it finds back as RFIs. Autodesk Assistant searches drawings and Drawing Change Analysis compares revisions, Buildcheck pushes human-validated comments into Forma, Trunk Tools checks RFIs and revision changes, and Revizto coordinates models using Forma sheets.
Helonic has a native Autodesk Forma integration, the platform formerly called Autodesk Construction Cloud. It syncs projects and drawings, reviews every sheet, and can push the issues it finds back into Forma as RFIs.
In March 2026 Autodesk renamed Autodesk Construction Cloud to Autodesk Forma. Docs is now Forma Data Management, and Autodesk Build is now Forma Build. Most teams still call it ACC, and the integrations on this page work with the Forma names.
Drawing Compliance Review is an Autodesk Forma feature planned for early 2027. Autodesk says it will check drawing packages against building codes, design standards, and owner requirements, sorting issues into critical, major, and minor, with a professional reviewer still in the loop.
Construction IQ ranks risk from issues, checklists, and RFIs already logged in the project. To find clashes and code gaps on the sheets before anyone logs them, pair it with a drawing reviewer like Helonic.
Milind is the co-founder and CEO of Helonic, where he leads product and go-to-market for AI-powered construction drawing analysis. He works closely with general contractors, project managers, estimators, and owners to understand how drawing quality drives project outcomes - and where AI can reduce RFIs, change orders, and rework. Milind has interviewed hundreds of construction professionals across project delivery roles, from preconstruction estimators at ENR top-400 contractors to facilities directors at institutional owners, and uses those conversations to shape both product direction and the way Helonic talks about the work.
How this page was researched: Listed only tools whose Autodesk Construction Cloud (now Autodesk Forma) connection we could confirm from Autodesk's help docs, the Autodesk App Store, or vendor announcements in October 2026. Autodesk's own AI is described from Autodesk University 2026 announcements and Autodesk's RFI help pages, with beta and planned features labeled as such. Helonic is our product and is listed first for drawing review.
Last reviewed by Milind Sagaram · October 18, 2026