Helonic vs Autodesk Construction IQ

Drawing review before RFIs exist versus risk ranking on project records after work is logged

What is the difference between Helonic and Autodesk Construction IQ?

Autodesk Construction IQ is the machine learning risk layer inside Autodesk Build, now called Forma Build. It ranks issues, RFIs, quality, and safety records that a team has already logged. Helonic reviews the issued 2D PDF drawings and flags coordination and code problems before anyone writes an RFI.

Construction IQ reads what the team enters in Issues, RFIs, and Forms. The Design Risk Factors card ranks logged design issues tied to code compliance, critical building components, and errors and omissions. The RFI Risk Factors card sorts RFIs by root cause, discipline, and building component. The quality and safety cards flag issues that point to rework, water, or fall risk. Autodesk says the analysis runs on project data automatically, and its help docs note that it will not catch every high-risk issue.

Construction IQ can only rank a problem after someone has written it down. Helonic reads every sheet of the issued set, marks each finding at its sheet coordinates with a category and a severity, and a reviewer decides what goes forward. The Autodesk integration can push the issues Helonic finds into Autodesk Forma as RFIs, which puts them in the same records Construction IQ reads.

In March 2026 Autodesk moved Autodesk Construction Cloud under the Forma brand, and Autodesk Build became Forma Build. Construction IQ kept its name and still appears on Project Home and Insight dashboards. Autodesk Assistant is a separate chat layer with its own comparison page.

Choose Helonic if

  • You want problems found on the sheets before anyone logs an issue or writes an RFI
  • You need code and coordination checks on a 2D PDF set, with no BIM model
  • Each finding should be pinned to a sheet location a reviewer can open and verify
  • Some of your projects run on Procore instead of Autodesk

Choose Autodesk Construction IQ if

  • You want daily risk rankings across issues, RFIs, quality, and safety
  • Executives need a cross-project view of project and subcontractor risk
  • Your team already logs issues, RFIs, and forms in Forma Build
  • You want analysis that runs on existing records with no extra upload

How do Helonic and Autodesk Construction IQ compare on features?

Construction IQ ranks the records a team has logged. Helonic reads the drawings those records come from.

FeatureHelonicAutodesk Construction IQ
Reads issued 2D PDF drawing sheetsNot described by Autodesk
Finds problems before an issue or RFI is logged
Risk ranking of logged issues and RFIs
Code complianceChecked on the sheetRanks logged code issues
Findings at sheet coordinates with severityNot described by Autodesk
Quality and safety risk from field records
Subcontractor and cross-project risk view
Pushes found issues into Autodesk Forma as RFIsReads Autodesk records
Works on Procore projects
Built into Forma Build
BIM model required

Helonic vs Autodesk Construction IQ FAQs

What is Autodesk Construction IQ?
Autodesk Construction IQ is the machine learning risk tool in Autodesk Build, now Forma Build. It ranks issues, RFIs, quality, and safety records by risk to cost, schedule, quality, and safety, and shows the results on Project Home and Insight dashboards.
Is Construction IQ still available in 2026?
Yes. Autodesk's construction AI page still lists Construction IQ in October 2026. Autodesk Construction Cloud moved under the Forma brand in March 2026 and Autodesk Build became Forma Build, but Construction IQ kept its name.
Does Construction IQ review drawings?
Autodesk describes Construction IQ as analyzing issues, RFIs, checklists, and observations, not drawing sheets. Its Design Risk Factors card ranks design issues a team has already logged. Helonic reads the issued 2D PDF set and finds problems before they are logged.
Can Helonic and Construction IQ run together?
Helonic pulls drawings from Autodesk Forma, and the integration can push the issues it finds back as RFIs. Construction IQ reads issues and RFIs, so those RFIs join the records it ranks.
How is Construction IQ different from Autodesk Assistant?
Construction IQ ranks risk in logged project records and shows it on dashboards. Autodesk Assistant is the chat layer that answers questions across specs, RFIs, issues, and schedules. Helonic vs Autodesk Assistant covers that comparison.
Do I need Helonic if I already have Construction IQ?
Construction IQ helps after work is logged. Helonic covers the step before that: reading the issued set for coordination and code problems nobody has written up. Autodesk's own research found that over 70% of RFIs stem from design or documentation issues, which is the work a drawing review pass targets.
MS

Milind Sagaram

Co-founder & CEO, Helonic

Milind is the co-founder and CEO of Helonic, where he leads product and go-to-market for AI-powered construction drawing analysis. He works closely with general contractors, project managers, estimators, and owners to understand how drawing quality drives project outcomes - and where AI can reduce RFIs, change orders, and rework. Milind has interviewed hundreds of construction professionals across project delivery roles, from preconstruction estimators at ENR top-400 contractors to facilities directors at institutional owners, and uses those conversations to shape both product direction and the way Helonic talks about the work.

Areas of focus
  • Construction project delivery and preconstruction
  • RFI and change order economics
  • Owner and GC workflows for drawing QA/QC
  • Estimating risk and bid-stage scope assessment

How this page was researched: Comparison based on Autodesk's Construction IQ product page, its Construction IQ help documentation, Autodesk Digital Builder posts on Design and RFI Risk Factors, the March 2026 Forma rename notice, and Helonic's shipped Autodesk drawing pull and RFI push. Distinct from Helonic vs Autodesk Build and Helonic vs Autodesk Assistant.

Last reviewed by Milind Sagaram · October 18, 2026

Review the set before the RFIs start

Helonic reads the issued 2D PDFs and can push the issues it finds into Autodesk Forma as RFIs. Construction IQ keeps ranking what the team logs.