Helonic
Drawing Review

What an AI Drawing Review Findings Export Must Include

Published November 6, 2026•3 min read

Helonic is an AI construction drawing analysis platform for preconstruction teams checking what an AI drawing review findings export must include before they buy. An AI drawing review findings export has to serve as the team's record, and a printout falls short of that. If a row can't say which sheet, where on it, which trade, and what to do, the list can't be audited, assigned, or handed to anyone outside the tool.

Direct answer. A findings export from Helonic or any AI drawing review tool should give one row per finding with sheet number, location, category, severity, the conflicting source, a one-sentence action, the reviewer's decision, and a status. If any of those is missing, the export can't be audited.

Which fields does every row need?

FieldWhy the row needs it
Sheet numberPrinted on the sheet, so anyone can find it without the tool
Location on the sheetZone, grid, or coordinates, so the reader lands on the spot
Category and tradeLets you route the row to the right person
SeveritySets the order of the work
Conflicting sourceThe other sheet, schedule, or spec section in the disagreement
Action sentenceWhat someone should do, in plain words
Reviewer decisionKept, edited, or dismissed, and by whom
StatusOpen, assigned, resolved

The subcontractor-facing version of this list is in what an AI review export needs before subs will answer it. This page covers the internal record.

Which formats should you ask for?

Excel or CSV for sorting and filtering, PDF for a read-only record, and an integration for RFIs and issues. A single format rarely covers all three jobs.

Check that the export labels sheets the way your set does. Sheet A-201 in the tool and A201 on the title block lead to wrong lookups.

What should make you reject an export?

  • Findings as images inside a document, which can't be sorted.
  • Merged cells that break filters.
  • Page numbers of the PDF instead of printed sheet numbers.
  • No record of what the reviewer kept or dismissed.

Ownership and assignment come next. A list with no owner column dies in a folder, as what makes an AI drawing review finding assignable explains.

How do you test the export in a pilot?

Export 20 findings and hand them to someone who wasn't in the pilot. Ask them to find each one on the PDF with only the export. If they can't, the export fails, whatever the demo looked like.

Put the result on the pilot score sheet next to the measures in what to measure in an AI drawing review pilot.

What does Helonic's export carry?

Each Helonic finding has a category, a severity, and the page coordinates of the cited location, and exports label sheets the way the review screen does, in Excel and PDF as well as RFIs. Accepted findings can be created as RFIs in Procore or Autodesk through RFI generation. Check any export against the field list above on your own set.

Practitioner insight

“I handed the export to a PM who'd never seen the tool and asked him to find five items. He found four in a couple of minutes. That's the export I wanted.”

Conversations with preconstruction managers who tested findings exports from AI drawing review tools.

Frequently Asked Questions

What should an AI drawing review export include?
One row per finding: sheet number, location, category and trade, severity, conflicting source, an action sentence, reviewer decision, and status.
Which export formats do I need?
Excel or CSV to sort and filter, PDF for a read-only record, and an integration for RFIs and issues.
How do I test an export?
Give 20 exported findings to someone who wasn't in the pilot and see whether they can find each on the PDF using only the export.
What does a Helonic finding include?
A category, a severity, and the page coordinates of the cited location. Accepted findings can become RFIs in Procore or Autodesk after a reviewer confirms them.
MS

Milind Sagaram

Co-founder & CEO, Helonic

Milind is the co-founder and CEO of Helonic, where he leads product and go-to-market for AI-powered construction drawing analysis. He works closely with general contractors, project managers, estimators, and owners to understand how drawing quality drives project outcomes - and where AI can reduce RFIs, change orders, and rework. Milind has interviewed hundreds of construction professionals across project delivery roles, from preconstruction estimators at ENR top-400 contractors to facilities directors at institutional owners, and uses those conversations to shape both product direction and the way Helonic talks about the work.

Areas of focus
  • Construction project delivery and preconstruction
  • RFI and change order economics
  • Owner and GC workflows for drawing QA/QC
  • Estimating risk and bid-stage scope assessment

Last reviewed by Milind Sagaram · November 2026

Related Reading