Pre-screen submittals for code compliance
Helonic is an AI construction drawing analysis platform for plan reviewers who review 2D PDF drawing sets.
Reduce review cycles and maintain consistent standards across your team. Helonic does the first pass against IBC, NFPA, ADA, and energy code so your reviewers can focus on judgment calls.
What slows down plan reviewers?
Plan reviewers cannot keep every submittal equally thorough when volume rises and staff time stays flat.
- High Volume. Growing submittal backlogs with limited staff create pressure to review faster without sacrificing thoroughness.
- Code Complexity. Overlapping IBC, NFPA, ADA, and local amendments make comprehensive compliance checking extremely demanding.
- Consistency. Different reviewers catch different things, leading to inconsistent feedback and re-review cycles.
How does Helonic help?
Helonic pre-screens each submittal for common IBC and life-safety gaps so reviewers start from a consistent first-pass list.
The pre-check runs the same rules as code compliance checking, egress compliance, and ADA accessibility checking, with each finding tied to a code section for the reviewer to confirm.
- Code compliance pre-check. Automatically screen submittals against IBC, NFPA, ADA, and energy code requirements before a human reviewer opens the drawings. Flag the most likely non-compliance areas for focused review.
- Review consistency. Apply the same comprehensive checklist to every submittal regardless of which reviewer handles it. Eliminate the variability between senior and junior reviewers.
- Priority flagging. Categorize issues by severity, life safety items surface first, followed by structural concerns, then general compliance. Reviewers can focus their time on the issues that matter most.
- Automated checklists. Generate discipline-specific review checklists based on the project type and applicable codes. Track completion and ensure nothing is overlooked during the review process.
- Review documentation. Maintain a complete audit trail of what was reviewed, what was flagged, and what was approved. Simplify re-review cycles by showing exactly what changed between submissions.
What issues does Helonic catch?
Helonic flags egress, occupancy, fire-separation, and accessibility items that otherwise wait for a later review cycle.
Life Safety & Fire
- Fire/life safety system gaps and omissions
- Egress width and travel distance violations
- Fire-rated assembly discontinuities
- Missing fire alarm and detection coverage
General Compliance
- ADA accessibility non-compliance
- Structural design concerns
- MEP code requirement gaps
- Energy code and insulation issues
What return do plan reviewers see with Helonic?
Departments clear more submittals on the first cycle because obvious code gaps are already written up.
| Figure | What it measures |
|---|---|
| 50% | Faster initial review turnaround |
| 95% | Code coverage of compliance checks per review |
| Consistent | Review quality across all staff |
Frequently Asked Questions
How does Helonic assist code plan review?
Does it replace the plan reviewer's determination?
Which codes does it check against?
Can it help reduce plan-review backlog?
Milind Sagaram
Co-founder & CEO, HelonicMilind is the co-founder and CEO of Helonic, where he leads product and go-to-market for AI-powered construction drawing analysis. He works closely with general contractors, project managers, estimators, and owners to understand how drawing quality drives project outcomes - and where AI can reduce RFIs, change orders, and rework. Milind has interviewed hundreds of construction professionals across project delivery roles, from preconstruction estimators at ENR top-400 contractors to facilities directors at institutional owners, and uses those conversations to shape both product direction and the way Helonic talks about the work.
- Construction project delivery and preconstruction
- RFI and change order economics
- Owner and GC workflows for drawing QA/QC
- Estimating risk and bid-stage scope assessment
How this page was researched: Code-review guidance references IBC, NFPA, and ADA/ANSI A117.1 provisions plus local amendment workflows plan reviewers apply. Examples reflect the code items Helonic most often flags on submitted drawing sets.
Last reviewed by Milind Sagaram · August 11, 2026