Verify design intent, cross-reference sequences of operation, and identify control points across all building systems.
The recurring document problems that bleed into functional testing.
The Owner's Project Requirements must be traced through Basis of Design documents to actual drawing details, a tedious manual process.
Mechanical, electrical, plumbing, and controls systems must work together as designed, but drawing sets often contain conflicting information.
Written sequences frequently do not match what is shown on control diagrams, mechanical schedules, and electrical power drawings.
From OPR to functional testing, Helonic supports every step of the commissioning workflow.
Cross-reference OPR and BOD requirements against actual drawing details to confirm that design intent is accurately reflected in construction documents across all disciplines.
Compare written sequences of operation against mechanical drawings, control diagrams, and electrical schematics to flag inconsistencies before functional testing begins.
Automatically catalog all control points, sensors, actuators, and monitoring devices shown on drawings to build comprehensive pre-functional checklists and points lists.
Extract airflow and water flow design values from mechanical schedules and drawings to prepare TAB requirements and verify consistency across the document set.
Identify where building systems interact, BAS to fire alarm, lighting controls to HVAC, emergency power to life safety, and verify integration points are properly documented.
The coordination and controls gaps Helonic flags before functional testing starts.
What commissioning teams typically see after adopting Helonic.