AI drawing review for commissioning agents

Verify design intent, cross-reference sequences of operation, and identify control points across all building systems.

What slows down commissioning agents

The recurring document problems that bleed into functional testing.

Verifying Design Intent

The Owner's Project Requirements must be traced through Basis of Design documents to actual drawing details, a tedious manual process.

Systems Coordination

Mechanical, electrical, plumbing, and controls systems must work together as designed, but drawing sets often contain conflicting information.

Sequence of Operations

Written sequences frequently do not match what is shown on control diagrams, mechanical schedules, and electrical power drawings.

How Helonic helps

From OPR to functional testing, Helonic supports every step of the commissioning workflow.

1

Design Intent Verification

Cross-reference OPR and BOD requirements against actual drawing details to confirm that design intent is accurately reflected in construction documents across all disciplines.

2

Sequence of Operations Cross-Reference

Compare written sequences of operation against mechanical drawings, control diagrams, and electrical schematics to flag inconsistencies before functional testing begins.

3

Control Point Identification

Automatically catalog all control points, sensors, actuators, and monitoring devices shown on drawings to build comprehensive pre-functional checklists and points lists.

4

Test and Balance Preparation

Extract airflow and water flow design values from mechanical schedules and drawings to prepare TAB requirements and verify consistency across the document set.

5

Systems Integration Review

Identify where building systems interact, BAS to fire alarm, lighting controls to HVAC, emergency power to life safety, and verify integration points are properly documented.

Common issues we catch

The coordination and controls gaps Helonic flags before functional testing starts.

Controls & Sequences

  • Missing control points not shown on control diagrams
  • Sequence of operations contradicting mechanical drawings
  • Sensor placement errors affecting system performance
  • Damper and valve positions inconsistent with sequences

Integration & Coordination

  • Integration gaps between BAS, fire alarm, and lighting
  • TAB design values inconsistent across schedules and plans
  • Emergency power sequences not matching life safety requirements
  • Metering and monitoring points missing from energy systems

ROI for commissioning agents

What commissioning teams typically see after adopting Helonic.

FASTER Cx PLAN
40%
from automated drawing extraction
ISSUES CAUGHT
30+
design issues pre-construction per project
OUTCOMES
Better
functional testing from thorough design review