How to Read a Structural General Notes Sheet

The design criteria, material specs, and special inspection requirements that govern the whole structural set, and how to catch them when they drift out of sync with the plans.

The structural general notes sheet is usually the first S-series sheet in the set, and it's also the one most people skip straight past to get to the framing plan. That's a mistake. The general notes carry the design criteria the entire structural design was built on: the loads, the material strengths, the code edition, the special inspections required. When a plan reviewer or a field team finds a conflict between what the notes say and what the plans show, it's usually because nobody checked the notes against the current drawings after the design changed.

This guide breaks down what belongs on a structural general notes sheet, why it drifts out of sync with the rest of the set, and how to check it before the sheet goes out the door.

Quick answer

A structural general notes sheet states the design criteria (loads, wind and seismic parameters, soil bearing), material specifications (concrete strength, rebar and steel grades), the adopted code edition, required special inspections, and deferred submittals that govern the entire structural set. Reading it correctly means checking every value against the current plans and calculations, not just reading it as boilerplate carried over from the last project.

What Belongs on a Structural General Notes Sheet

Six categories of information make up most general notes sheets:

Design criteria
Live and dead loads, wind speed and exposure category, seismic design category and site class, soil bearing capacity
Material specifications
Concrete strength (f'c) by element, rebar grade (ASTM A615/A706), structural steel grade (A992, A36, A500), wood species and grade
Code basis
Adopted code edition (IBC 2021, ASCE 7-22) and any local amendments the jurisdiction has adopted
Special inspections
Welding and bolting inspection, concrete placement, soils and foundations, post-installed anchors, per IBC Chapter 17
Deferred submittals
Precast connections, specialty metals, or other items the EOR is deferring to a later submission
Abbreviations legend
The key to every abbreviation used across the structural sheets, so a reader isn't guessing at notation

Firm-specific formats vary, but a note category missing entirely, rather than just formatted differently, is worth flagging on any set you're reviewing.

Why General Notes Drift Out of Sync With the Plans

General notes get written once, usually early, and rarely get revisited line by line every time the framing plan or foundation design changes. A soil bearing value entered at schematic design based on a preliminary geotechnical report can go stale once the final geotechnical report comes back with a different number. A seismic design category can shift after a code update mid-project and never get updated in the notes even though the calculations were rerun. None of these are dramatic errors on their own, but each one is exactly the kind of internal inconsistency a plan reviewer is trained to catch, and each one generates a correction letter that pushes the permit timeline back a review cycle.

A Checklist for Reviewing General Notes Against the Set

  • Loads: Do the live and dead loads stated in the notes match what the calculations were run against, and match any load values called out directly on the framing plans?
  • Seismic and wind parameters: Does the seismic design category, site class, and wind exposure match the current code edition and the site's actual conditions, not a value carried over from a template?
  • Material strengths: Does the concrete strength and rebar grade in the notes match every schedule and detail that specifies concrete or reinforcing, with no silent exceptions?
  • Special inspections: Does the special inspection list actually cover every structural system used in the design, including anything added late, like post-installed anchors or a deferred precast connection?
  • Code edition: Is the cited code edition the one actually adopted by the jurisdiction of record, not the edition the firm's template defaults to?

Checking each of these by hand across a full set, especially on a resubmission where only part of the design changed, is exactly the kind of cross-reference work that's easy to skip under deadline pressure and easy for automated cross-referencing to catch consistently instead.

General Notes vs. Keynotes: Don't Confuse the Two

General notes apply to the whole sheet or the whole set and are listed once, usually on the first structural sheet. Keynotes are numbered callouts pointing at one specific location on one specific detail, referencing a legend for the full text. Reviewers sometimes look for a design criterion in the keynote legend when it actually lives in the general notes, or vice versa. For the full distinction between the two and where each belongs, see keynotes vs. general notes.

Where This Fits in a Broader Structural Review

General notes are one piece of a larger structural set that includes framing plans, foundation plans, sections, and connection details. For the full picture of how to read the rest of that set, see how to review construction drawings, which covers the discipline-by-discipline review process this checklist fits into. For how AI review specifically handles the structural discipline, including cross-checking general notes against plans automatically, see AI for structural engineering.

Practitioner insight

The general notes sheet is the one page nobody re-reads after the first draft. I've seen a soil bearing value sit in the notes for six months after the geotech report came back different, because the plans got all the revision attention and the notes sheet didn't get touched. It's boring to review, which is exactly why it needs a checklist instead of a skim.

Source: Conversations with structural engineers and QA/QC leads at structural engineering firms about recurring plan check correction patterns, synthesized from Helonic's structural-discipline interviews, Q2 2026.

Structural General Notes FAQ

What is included in structural general notes?
Structural general notes typically cover design criteria (live and dead loads, wind speed, seismic design category, soil bearing capacity), material specifications (concrete strength f'c, rebar grade, structural steel grade, wood species and grade), the applicable code edition, special inspection and testing requirements, deferred submittal items, and abbreviations used elsewhere in the set. They're usually the first one or two sheets in the S-series.
What's the difference between general notes and keynotes?
General notes apply to the entire structural set or an entire sheet and are listed once, typically on the first structural sheet. Keynotes are numbered callouts tied to a specific location on a specific detail or plan, referencing a keynote legend for the full text. For a full breakdown of how the two differ and where each is used, see keynotes vs. general notes.
Why do general notes conflict with the drawings so often?
General notes are usually written once early in design and rarely get revised in step with later changes to the framing plan, foundation design, or connection details. A seismic design category or soil bearing value entered in the notes at schematic design can go stale by the time the set reaches permit, while the plans and calculations have moved on. Cross-checking the notes against the current plans on every issuance catches this before a plan reviewer or a field team does.
Who is responsible for structural general notes being accurate?
The engineer of record is responsible for the accuracy and completeness of the general notes, since they carry the design criteria the sealed drawings rely on. In practice, general notes get assembled by whoever drafts the sheet, often a project engineer or CAD technician, and don't always get the same scrutiny as the plans themselves during QA/QC, which is exactly where the gaps show up.
Do general notes need to match the structural calculations exactly?
Yes. If the general notes state a live load, seismic design category, or soil bearing value that doesn't match what the calculations were run against, a plan reviewer will flag the inconsistency and the set will come back with a correction notice. This is one of the most common categories of structural plan check comments, and it's avoidable with a direct comparison between the notes and the calculation package before the set is issued.
What special inspections are typically called out in structural general notes?
Common special inspections listed in structural general notes include structural steel welding and bolting, high-strength bolting, concrete placement and reinforcement, post-installed anchors, soils and foundations, and any deferred submittal items like precast connections or specialty metals. The exact list depends on the structural system and the adopted code edition's special inspection requirements (typically IBC Chapter 17).
MG

Manas Gandhi

Co-founder & CTO, Helonic

Manas is the co-founder and CTO of Helonic, where he leads engineering and AI research for construction drawing analysis. He works directly with structural, MEP, civil, and fire protection engineers to translate the way they review drawings into AI systems that flag the issues that actually matter in the field. Before Helonic, he built machine learning pipelines for technical document understanding and has spent the last several years interviewing licensed design engineers and discipline leads to ground product decisions in real practice rather than industry assumptions.

Areas of focus
  • AI for technical document understanding
  • Cross-discipline coordination workflows
  • Code compliance automation (IBC, NEC, NFPA, IPC, IMC, ASCE)
  • Structural and MEP drawing review systems

How this page was researched: Checklist categories reviewed against common structural plan check correction patterns and IBC Chapter 17 special inspection requirements, focused on the general notes to plan-and-calculation consistency gaps that recur most often on resubmissions.

Last reviewed by Manas Gandhi · July 2026