AI Code Compliance Check
Helonic checks your construction drawings against major building codes across every discipline. Select a code and discipline below to learn what our AI checks for.
Building codes we check against
15 codes across 7 disciplines
International Building Code
Commercial, institutional, multifamily (3+ units), and mixed-use buildings
2021 IBC (current), 2018, 2015, 2012
International Residential Code
One- and two-family dwellings, townhouses up to 3 stories
2021 IRC (current), 2018, 2015, 2012
California Building Code (Title 24 Part 2)
All construction in California
2022 CBC (based on 2021 IBC), 2019 CBC
Florida Building Code
All construction in Florida
7th Edition FBC (2023), 6th Edition
National Electrical Code (NFPA 70)
Electrical installations in all building types
2023 NEC, 2020, 2017, 2014
NFPA 13 / 72 (Fire Protection Standards)
Fire sprinkler systems (NFPA 13) and fire alarm systems (NFPA 72)
NFPA 13 (2022), NFPA 72 (2022)
ADA Standards for Accessible Design
Public accommodations, commercial facilities, state and local government facilities
2010 ADA Standards (current)
International Plumbing Code
Plumbing systems in all building types
2021 IPC (current), 2018, 2015
International Mechanical Code
Mechanical and HVAC systems in all building types
2021 IMC (current), 2018, 2015
International Energy Conservation Code
Energy efficiency for all new buildings and major renovations
2021 IECC (current), 2018, 2015
ASCE 7 - Minimum Design Loads and Associated Criteria
Structural load calculations for all building types
ASCE 7-22 (current), ASCE 7-16, ASCE 7-10
New York City Building Code
All construction in the five boroughs of New York City
2022 NYC Building Code (current)
NFPA 101 - Life Safety Code
Life safety from fire in all building types; primary code for healthcare facilities
NFPA 101 (2021), 2018, 2015
California Title 24 Energy Code (Part 6)
Energy efficiency for all new construction and major renovations in California
2022 Title 24 Part 6 (current), 2019
ASHRAE Standard 90.1 - Energy Standard for Buildings
Energy efficiency for commercial buildings (non-residential and high-rise residential)
ASHRAE 90.1-2022, 2019, 2016, 2013