ASHRAE 90.1×Electrical

ASHRAE 90.1 Electrical compliance check

Helonic checks electrical construction drawings against ASHRAE Standard 90.1 - Energy Standard for Buildings to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.

About ASHRAE Standard 90.1 - Energy Standard for Buildings

The ASHRAE energy standard for commercial buildings, widely referenced by the IECC and many state energy codes. Covers building envelope, HVAC, service water heating, power, lighting, and renewable energy requirements.

Scope

Energy efficiency for commercial buildings (non-residential and high-rise residential)

Editions

ASHRAE 90.1-2022, 2019, 2016, 2013

Applicability

Referenced by the IECC as a compliance pathway. Adopted directly by some states and federal agencies (GSA, DOD).

What we check for

Lighting power density (LPD) per ASHRAE 90.1 Section 9
Lighting controls per Section 9.4: occupancy sensors, daylight responsive
Exterior lighting power per Section 9.4.2
Receptacle and plug load controls per Section 8.4
Transformer efficiency per Section 8.1
Motor efficiency per Section 10

Common Electrical issues we catch

Electrical power distribution, lighting, fire alarm, low-voltage, and communications drawings.

!
Panel schedule circuit count and load calculation errors
!
Working clearance violations at electrical equipment (NEC 110.26)
!
Missing arc flash labels and hazard analysis
!
Grounding and bonding continuity gaps
!
Emergency/standby power system sizing errors
!
Fire alarm device spacing and coverage gaps
!
Lighting power density exceedances

Why ASHRAE 90.1 Electrical compliance matters

ASHRAE Standard 90.1 - Energy Standard for Buildings compliance for electrical drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching ASHRAE 90.1 electrical issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).

How Helonic checks ASHRAE 90.1 compliance

1

Upload your PDF drawings

Upload your electrical PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.

2

Purpose-built construction AI

Helonic's AI is trained specifically to review construction drawings against ASHRAE 90.1 requirements. Domain-specific training catches issues that generic AI tools miss.

3

Exact issue locations

Every ASHRAE 90.1 compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.

4

One-click RFI generation

Turn detected ASHRAE 90.1 issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.

Related resources

ASHRAE 90.1 checks for other disciplines

Electrical checks against other codes

Check your electrical drawings against ASHRAE 90.1

Upload your PDF drawings and our AI checks them for ASHRAE Standard 90.1 - Energy Standard for Buildings compliance, automatically.