ADA Electrical compliance check
Helonic checks electrical construction drawings against ADA Standards for Accessible Design to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.
About ADA Standards for Accessible Design
Federal accessibility standards required for all public accommodations and commercial facilities. Covers accessible routes, restrooms, parking, signage, and communication features.
Scope
Public accommodations, commercial facilities, state and local government facilities
Editions
2010 ADA Standards (current)
Applicability
Federal law - applies to all new construction and alterations of public and commercial buildings nationwide.
What we check for
Common Electrical issues we catch
Electrical power distribution, lighting, fire alarm, low-voltage, and communications drawings.
Why ADA Electrical compliance matters
ADA Standards for Accessible Design compliance for electrical drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching ADA electrical issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).
How Helonic checks ADA compliance
Upload your PDF drawings
Upload your electrical PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.
Purpose-built construction AI
Helonic's AI is trained specifically to review construction drawings against ADA requirements. Domain-specific training catches issues that generic AI tools miss.
Exact issue locations
Every ADA compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.
One-click RFI generation
Turn detected ADA issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.