NFPA Electrical compliance check
Helonic checks electrical construction drawings against NFPA 13 / 72 (Fire Protection Standards) to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.
About NFPA 13 / 72 (Fire Protection Standards)
NFPA 13 covers automatic sprinkler system design and installation. NFPA 72 covers fire alarm and signaling systems. Together they define most fire protection requirements referenced by the IBC.
Scope
Fire sprinkler systems (NFPA 13) and fire alarm systems (NFPA 72)
Editions
NFPA 13 (2022), NFPA 72 (2022)
Applicability
Referenced by IBC and adopted in nearly all US jurisdictions.
What we check for
Common Electrical issues we catch
Electrical power distribution, lighting, fire alarm, low-voltage, and communications drawings.
Why NFPA Electrical compliance matters
NFPA 13 / 72 (Fire Protection Standards) compliance for electrical drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching NFPA electrical issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).
How Helonic checks NFPA compliance
Upload your PDF drawings
Upload your electrical PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.
Purpose-built construction AI
Helonic's AI is trained specifically to review construction drawings against NFPA requirements. Domain-specific training catches issues that generic AI tools miss.
Exact issue locations
Every NFPA compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.
One-click RFI generation
Turn detected NFPA issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.