NYC BC Structural compliance check
Helonic checks structural construction drawings against New York City Building Code to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.
About New York City Building Code
New York City's independent building code with NYC-specific requirements that differ significantly from the IBC. Covers unique provisions for high-rise, mixed-use, and the city's complex zoning resolution.
Scope
All construction in the five boroughs of New York City
Editions
2022 NYC Building Code (current)
Applicability
Mandatory in NYC. Uses its own code (not the NYS code) with DOB enforcement.
What we check for
Common Structural issues we catch
Structural drawings including foundations, framing plans, connection details, and lateral systems.
Why NYC BC Structural compliance matters
New York City Building Code compliance for structural drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching NYC BC structural issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).
How Helonic checks NYC BC compliance
Upload your PDF drawings
Upload your structural PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.
Purpose-built construction AI
Helonic's AI is trained specifically to review construction drawings against NYC BC requirements. Domain-specific training catches issues that generic AI tools miss.
Exact issue locations
Every NYC BC compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.
One-click RFI generation
Turn detected NYC BC issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.