IECC×Mechanical

IECC Mechanical compliance check

Helonic checks mechanical construction drawings against International Energy Conservation Code to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.

About International Energy Conservation Code

The model energy code setting minimum efficiency requirements for building envelopes, mechanical systems, lighting, and service water heating. Referenced by many state energy codes.

Scope

Energy efficiency for all new buildings and major renovations

Editions

2021 IECC (current), 2018, 2015

Applicability

Adopted or used as baseline in most US states. Many states add amendments or use their own (e.g., California Title 24 Part 6).

What we check for

IECC compliance checking for mechanical drawings
Cross-reference mechanical details against International Energy Conservation Code requirements
Verify mechanical specifications meet IECC minimum standards
Check mechanical coordination against IECC referenced standards
Identify mechanical issues that could cause IECC compliance failures
Review mechanical drawings for common IECC violations

Common Mechanical issues we catch

HVAC, exhaust, ventilation, and refrigeration drawings.

!
Outdoor air ventilation rate calculation errors (ASHRAE 62.1)
!
Duct sizing and static pressure calculation mismatches
!
Equipment clearance and access deficiencies
!
Exhaust system termination proximity to intakes
!
Kitchen hood makeup air deficiencies
!
Smoke control system design gaps
!
Energy code compliance - equipment efficiency and controls

Why IECC Mechanical compliance matters

International Energy Conservation Code compliance for mechanical drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching IECC mechanical issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).

How Helonic checks IECC compliance

1

Upload your PDF drawings

Upload your mechanical PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.

2

Purpose-built construction AI

Helonic's AI is trained specifically to review construction drawings against IECC requirements. Domain-specific training catches issues that generic AI tools miss.

3

Exact issue locations

Every IECC compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.

4

One-click RFI generation

Turn detected IECC issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.

Related resources

IECC checks for other disciplines

Mechanical checks against other codes

Check your mechanical drawings against IECC

Upload your PDF drawings and our AI checks them for International Energy Conservation Code compliance, automatically.