ASCE 7 Structural compliance check
Helonic checks structural construction drawings against ASCE 7 - Minimum Design Loads and Associated Criteria to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.
About ASCE 7 - Minimum Design Loads and Associated Criteria
The reference standard for structural loads: dead, live, wind, snow, seismic, rain, flood, and ice. Referenced by the IBC for all structural load calculations.
Scope
Structural load calculations for all building types
Editions
ASCE 7-22 (current), ASCE 7-16, ASCE 7-10
Applicability
Referenced by the IBC - applies wherever the IBC is adopted.
What we check for
Common Structural issues we catch
Structural drawings including foundations, framing plans, connection details, and lateral systems.
Why ASCE 7 Structural compliance matters
ASCE 7 - Minimum Design Loads and Associated Criteria compliance for structural drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching ASCE 7 structural issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).
How Helonic checks ASCE 7 compliance
Upload your PDF drawings
Upload your structural PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.
Purpose-built construction AI
Helonic's AI is trained specifically to review construction drawings against ASCE 7 requirements. Domain-specific training catches issues that generic AI tools miss.
Exact issue locations
Every ASCE 7 compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.
One-click RFI generation
Turn detected ASCE 7 issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.