NFPA 101 Fire Protection compliance check
Helonic checks fire protection construction drawings against NFPA 101 - Life Safety Code to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.
About NFPA 101 - Life Safety Code
The comprehensive life safety code addressing construction, protection, and occupancy features necessary to minimize danger to life from fire, smoke, fumes, and panic. Widely adopted for existing buildings and healthcare facilities.
Scope
Life safety from fire in all building types; primary code for healthcare facilities
Editions
NFPA 101 (2021), 2018, 2015
Applicability
Required by CMS for healthcare facilities (hospitals, nursing homes). Also adopted by many states and the VA for all occupancy types.
What we check for
Common Fire Protection issues we catch
Fire sprinkler, standpipe, fire alarm, and smoke control drawings.
Why NFPA 101 Fire Protection compliance matters
NFPA 101 - Life Safety Code compliance for fire protection drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching NFPA 101 fire protection issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).
How Helonic checks NFPA 101 compliance
Upload your PDF drawings
Upload your fire protection PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.
Purpose-built construction AI
Helonic's AI is trained specifically to review construction drawings against NFPA 101 requirements. Domain-specific training catches issues that generic AI tools miss.
Exact issue locations
Every NFPA 101 compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.
One-click RFI generation
Turn detected NFPA 101 issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.