Title 24 Mechanical compliance check
Helonic checks mechanical construction drawings against California Title 24 Energy Code (Part 6) to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.
About California Title 24 Energy Code (Part 6)
California's Building Energy Efficiency Standards - the most stringent energy code in the US. Covers building envelope, HVAC, lighting, and solar-ready requirements. All-electric requirements for many building types since 2023.
Scope
Energy efficiency for all new construction and major renovations in California
Editions
2022 Title 24 Part 6 (current), 2019
Applicability
Mandatory for all construction in California. Exceeds IECC requirements significantly. National influence on energy code development.
What we check for
Common Mechanical issues we catch
HVAC, exhaust, ventilation, and refrigeration drawings.
Why Title 24 Mechanical compliance matters
California Title 24 Energy Code (Part 6) compliance for mechanical drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching Title 24 mechanical issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).
How Helonic checks Title 24 compliance
Upload your PDF drawings
Upload your mechanical PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.
Purpose-built construction AI
Helonic's AI is trained specifically to review construction drawings against Title 24 requirements. Domain-specific training catches issues that generic AI tools miss.
Exact issue locations
Every Title 24 compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.
One-click RFI generation
Turn detected Title 24 issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.