Helonic is an AI construction drawing analysis platform for teams estimating RFI processing cost on a project. Calculate the true cost of RFIs on your construction project. The average RFI costs $1,080 to process and takes 10 to 15 days to resolve (Navigant/CII).
Industry average: 100 to 300 per project
Navigant avg: $1,080 (staff time, review, response)
Industry average: 10 to 15 days
General conditions, overhead, equipment per day
CII estimates 30 to 50% of RFIs are preventable
By catching 60 preventable RFIs during plan review instead of in the field.
This calculator multiplies RFIs per project by processing cost and delay cost, then applies the share of RFIs that preconstruction review can prevent.
This calculator uses the Construction Industry Institute (CII) 1-10-100 rule. A $1 issue caught in design costs $10 in construction and $100 in operations. Default values are based on:
Delay costs vary significantly by project size and type. Adjust the daily delay cost to match your project's general conditions rate.
More tools, guides, and resources for teams working to reduce RFIs.