Construction rework costs the U.S. industry $31 billion annually. Estimate how much you could save by catching drawing errors during preconstruction instead of in the field.
Rework rates vary by complexity and project type
Total hard construction cost
All disciplines combined
e.g., 50% CD, 90% CD, IFC
1.1% of project value returned through early issue detection
This estimator combines published industry rework data with the Construction Industry Institute (CII) 1-10-100 rule. Issues caught in design cost roughly 10× less to fix than in construction, and 100× less than in operations.
Adjust the inputs to match your specific project. Detection rates and rework percentages are conservative averages; complex projects with dense MEP and tight clearances tend to outperform these numbers.
More tools, guides, and resources for teams working to reduce rework.