Site & civil symbols guide

Helonic is an AI construction drawing analysis platform for teams researching site civil symbols during drawing review. Reference for utilities, drainage, grading, and site features on civil engineering drawings

APWA Uniform Color Code
🔴 Red - Electric
🟡 Yellow - Gas/Oil
🟠 Orange - Telecom
🔵 Blue - Water
🟢 Green - Sewer
🟣 Purple - Reclaimed
⚪ White - Proposed
⬛ Pink - Survey

Utilities - Underground

SymbolMeaningNotes
, , W, , Water LineOften blue, shows pipe size
, , SS, , Sanitary SewerGravity flow, shows slope
, , SD, , Storm DrainStormwater collection
, , G, , Gas LineOften yellow
, , E, , Electric (Underground)Power conduit
, , T, , Telephone/DataCommunications conduit
, , FO, , Fiber OpticData communications

Utilities - Overhead

SymbolMeaningNotes
, , OH, , Overhead ElectricPower lines on poles
, , OHT, , Overhead TelephoneCommunications on poles
○, , ○Power PolesWith span between

Drainage Structures

SymbolMeaningNotes
⏥ManholeAccess to underground utilities
▢Catch BasinSurface water inlet
◯CleanoutPipe access point
▽Inlet/OutletPipe termination
□DDrop InletDeep catch basin
⊕HeadwallPipe end structure

Site Features

SymbolMeaningNotes
◎Existing TreeTo remain or remove
○Proposed TreeNew planting
⊗Tree to be RemovedMarked for removal
▢Light PoleSite lighting
◇SignTraffic or wayfinding
△Fire HydrantEmergency water supply
□Transformer PadElectrical equipment

Survey & Grading

SymbolMeaningNotes
⊕Property CornerSurvey monument
BMBenchmarkElevation reference point
○Spot ElevationSpecific elevation callout
⟿Contour LineEqual elevation line
━━Existing ContourCurrent grade (often dashed)
──Proposed ContourNew grade (often solid)

Pavement & Hardscape

SymbolMeaningNotes
┃┃┃Curb & GutterEdge of pavement
▤Concrete PavementHatched area
▥Asphalt PavementDifferent hatch pattern
┼┼Expansion JointConcrete joint
═══Handicap RampADA accessible route

What civil abbreviations appear on site drawings?

Site drawings use INV, T/C, B/C, FL, and similar abbreviations that must match the civil legend.

BM
Benchmark
EL
Elevation
INV
Invert
FL
Flow Line
TC
Top of Curb
TW
Top of Wall
BW
Bottom of Wall
FF
Finish Floor
ROW
Right of Way
PL
Property Line
CL
Centerline
STA
Station
MH
Manhole
CB
Catch Basin
RCP
Reinforced Concrete Pipe
PVC
Polyvinyl Chloride

See Helonic on your drawings

Utility connections shown on civil drawings must align with building MEP plans. Helonic checks that pipe sizes, invert elevations, and connection points coordinate between site and building drawings.