Helonic is an AI construction drawing analysis platform for people reading door schedule during plan review. Decode door schedules to order the right doors with the right hardware
The door schedule is the central reference for all door information: sizes, materials, fire ratings, and hardware. Understanding how to read it correctly prevents ordering errors and installation problems. Here's a column-by-column breakdown.
The door mark connects the schedule to the floor plan:
Room-based: 101, 102, 103 (door number matches room it opens into)
Room + Letter: 101A, 101B (multiple doors into same room)
Sequential: D-01, D-02 (doors numbered independently of rooms)
Always verify the door mark on the floor plan matches the schedule. Mismatches are a common source of errors.
Door sizes are typically shown as Width x Height x Thickness:
Door and frame materials are specified separately:
WD: Wood Door
HM: Hollow Metal
AL: Aluminum
GL: Glass
FRP: Fiberglass
HMF: Hollow Metal Frame
WDF: Wood Frame
ALF: Aluminum Frame
KD: Knock-Down Frame
WG: Welded Frame
Fire-rated doors have specific requirements:
Hardware is typically specified by set number that references a hardware schedule:
Always check the full hardware schedule for complete set contents including hinges, closers, stops, and seals.
Look for additional columns or remarks indicating:
Cross-check the schedule against the plans:
Related references and guides for schedules and openings.
Understand window schedules for ordering and installation.
Why coordination errors happen and how to prevent them.
Checking fire-rated assemblies including doors and frames.
Compare automated and manual approaches to schedule checking.