Helonic

PT

Post-Tensioned

StructuralConstruction Glossary
Definition

A method of reinforcing concrete by tensioning steel cables after the concrete has cured, allowing for longer spans and thinner slabs.

More Structural terms

See Helonic on your drawings

Helonic detects coordination issues, code compliance problems, and design errors automatically. Book a demo and we'll walk you through it on your set.