Helonic is an AI construction drawing analysis platform for teams researching bim execution plan guide during drawing review.
What a BEP actually defines, how LOD works by project phase, and why the 2D drawing set still needs its own review even on a model-driven project.
A BIM Execution Plan (BEP) is the project-specific document that defines how a team will use building information modeling: who authors which model elements, what Level of Development each discipline reaches at each phase, how models federate together for coordination, and who owns clash resolution. It gets negotiated at kickoff, usually led by the architect or a BIM manager, and it's the reference every discipline points back to when a coordination dispute comes up mid-project.
Teams that skip a real BEP, or write one nobody actually agreed to, tend to find out the hard way: at a coordination meeting, when the MEP model is at LOD 200 and the structural model is at LOD 350, and neither side realized the mismatch until clashes that should have been caught months earlier show up during cross-discipline coordination.
A BIM Execution Plan is a negotiated project document that assigns model authorship by discipline, sets the Level of Development (LOD) each model element must reach at each phase, and defines file formats, naming conventions, and coordination responsibility. LOD ranges from LOD 100 (conceptual massing) to LOD 400 (fabrication-level detail), with LOD 350 the common target for coordination and clash detection. The BEP is what keeps every discipline modeling to the same expectations instead of finding out about a mismatch at a coordination meeting.
A BIM execution plan defines who models what, the LOD required at each phase, how models federate, and who owns clash resolution.
LOD describes how much a model element can be relied on, not how visually detailed it looks. A structural column modeled as a simple box at LOD 200 and a fully detailed column with connection plates at LOD 400 might look similar on screen, but only one of them is ready to fabricate from.
| LOD | What It Means | Typical Phase |
|---|---|---|
| LOD 100 | Conceptual mass or placeholder, no defined geometry | Schematic design |
| LOD 200 | Approximate size, shape, and location | Design development |
| LOD 300 | Precise size, shape, and location for the element itself | Construction documents |
| LOD 350 | LOD 300 plus interfaces with other systems, ready for coordination | Coordination / clash detection |
| LOD 400 | Fabrication-level detail: parts, connections, assembly information | Shop drawings / fabrication |
Mapping these levels against the drawing set phases a project issues (SD, DD, CD, IFC) keeps the model and the extracted drawings honest about how much detail each one is supposed to carry at a given point.
Most jurisdictions still require a 2D PDF set for permitting, and most field crews still work from printed or PDF sheets rather than pulling up a live federated model on a tablet mid-pour. That means the drawing set gets extracted from the model at a point in time, and it can quietly drift out of sync as the model keeps evolving after that extraction, unless the team has a disciplined re-extraction process locked into the BEP itself. This is the mechanism behind the BIM-to-field gap: not that the model was wrong, but that the sheet in the field was extracted before the model's last revision.
That's also where a review approach that reads the drawing set directly earns its keep on a BIM-driven project, not as a replacement for model coordination, but as a check on whatever actually got issued for construction. Helonic reads the 2D sheets a project issues, whether they came from a fully federated BIM workflow or a traditional drawing-based process, and flags coordination conflicts on the documents crews actually build from, independent of whether the source model itself was current when the sheet was pulled.
A practical BEP checklist covers authorship, LOD, coordinates, clash cadence, and the 2D drawing deliverables extracted from the model.
Practitioner insight
“The BEP almost always gets written in the first two weeks of a project and then nobody opens it again until there's a fight about whose model was supposed to be at what level. By the time that fight happens, you're usually three months into design and the mismatch is baked into two disciplines' workflows. The plans that actually work get revisited at every phase transition, not just signed once and filed away.”
Source: Conversations with structural engineers and BIM managers about coordination requirements on model-driven projects, synthesized from Helonic's structural engineering interviews, Q3 2026.
Manas is the co-founder and CTO of Helonic, where he leads engineering and AI research for construction drawing analysis. He works directly with structural, MEP, civil, and fire protection engineers to translate the way they review drawings into AI systems that flag the issues that actually matter in the field. Before Helonic, he built machine learning pipelines for technical document understanding and has spent the last several years interviewing licensed design engineers and discipline leads to ground product decisions in real practice rather than industry assumptions.
How this page was researched: Reviewed against BIMForum Level of Development (LOD) specification definitions and common BIM Execution Plan structures used on design-build and CM-at-Risk projects.
Last reviewed by Manas Gandhi · August 25, 2026
Related references for model coordination and drawing set management.
The full framework for reviewing a drawing set regardless of whether it's model- or CAD-derived.
Why what's modeled and what gets built still diverge, and how to close that gap.
SD, DD, CD, and IFC phases, and what detail level each one should carry.
Coordinating architectural, structural, and MEP models and drawings together.