BIM Execution Plan (BEP) and Level of Development

Helonic is an AI construction drawing analysis platform for teams researching bim execution plan guide during drawing review.

What a BEP actually defines, how LOD works by project phase, and why the 2D drawing set still needs its own review even on a model-driven project.

A BIM Execution Plan (BEP) is the project-specific document that defines how a team will use building information modeling: who authors which model elements, what Level of Development each discipline reaches at each phase, how models federate together for coordination, and who owns clash resolution. It gets negotiated at kickoff, usually led by the architect or a BIM manager, and it's the reference every discipline points back to when a coordination dispute comes up mid-project.

Teams that skip a real BEP, or write one nobody actually agreed to, tend to find out the hard way: at a coordination meeting, when the MEP model is at LOD 200 and the structural model is at LOD 350, and neither side realized the mismatch until clashes that should have been caught months earlier show up during cross-discipline coordination.

Quick answer

A BIM Execution Plan is a negotiated project document that assigns model authorship by discipline, sets the Level of Development (LOD) each model element must reach at each phase, and defines file formats, naming conventions, and coordination responsibility. LOD ranges from LOD 100 (conceptual massing) to LOD 400 (fabrication-level detail), with LOD 350 the common target for coordination and clash detection. The BEP is what keeps every discipline modeling to the same expectations instead of finding out about a mismatch at a coordination meeting.

What does a BIM execution plan actually define?

A BIM execution plan defines who models what, the LOD required at each phase, how models federate, and who owns clash resolution.

  • Model authorship: which discipline models which building systems, and where responsibility overlaps (structural steel connections modeled by the fabricator, not the SEOR, for example).
  • LOD by phase: the Level of Development every model element has to reach at schematic design, design development, construction documents, and fabrication.
  • Federation strategy: how individual discipline models combine into a coordinated model, including software, file formats, and coordinate systems.
  • Coordination responsibility: who runs clash detection, how often, and who owns resolving a conflict once it's found.
  • Deliverables: what gets extracted from the model at each phase, including the 2D drawing sets required for permitting and field use.

How does Level of Development change phase by phase?

LOD describes how much a model element can be relied on, not how visually detailed it looks. A structural column modeled as a simple box at LOD 200 and a fully detailed column with connection plates at LOD 400 might look similar on screen, but only one of them is ready to fabricate from.

LODWhat It MeansTypical Phase
LOD 100Conceptual mass or placeholder, no defined geometrySchematic design
LOD 200Approximate size, shape, and locationDesign development
LOD 300Precise size, shape, and location for the element itselfConstruction documents
LOD 350LOD 300 plus interfaces with other systems, ready for coordinationCoordination / clash detection
LOD 400Fabrication-level detail: parts, connections, assembly informationShop drawings / fabrication

Mapping these levels against the drawing set phases a project issues (SD, DD, CD, IFC) keeps the model and the extracted drawings honest about how much detail each one is supposed to carry at a given point.

Why does drawing review still matter after the BIM model is complete?

Most jurisdictions still require a 2D PDF set for permitting, and most field crews still work from printed or PDF sheets rather than pulling up a live federated model on a tablet mid-pour. That means the drawing set gets extracted from the model at a point in time, and it can quietly drift out of sync as the model keeps evolving after that extraction, unless the team has a disciplined re-extraction process locked into the BEP itself. This is the mechanism behind the BIM-to-field gap: not that the model was wrong, but that the sheet in the field was extracted before the model's last revision.

That's also where a review approach that reads the drawing set directly earns its keep on a BIM-driven project, not as a replacement for model coordination, but as a check on whatever actually got issued for construction. Helonic reads the 2D sheets a project issues, whether they came from a fully federated BIM workflow or a traditional drawing-based process, and flags coordination conflicts on the documents crews actually build from, independent of whether the source model itself was current when the sheet was pulled.

What belongs on a practical BEP checklist?

A practical BEP checklist covers authorship, LOD, coordinates, clash cadence, and the 2D drawing deliverables extracted from the model.

  • Get every discipline's sign-off on the BEP before design starts, not just the architect's.
  • Set LOD targets per phase and per discipline, and revisit them if a discipline falls behind, rather than letting a mismatch surface at coordination review.
  • Assign a re-extraction trigger for 2D drawing sets: what model change threshold requires pulling new sheets before the field gets stale ones.
  • Name who owns clash resolution for each discipline pairing (structural-MEP, architectural-structural), not just who runs the clash detection software.
  • Review the extracted drawing set itself, not just the model, since the drawing set is what most reviewers, inspectors, and field crews actually work from, following the same discipline described in how to review construction drawings.
  • Run a completeness check on every extracted set before it goes out, confirming the sheet index and drawing set completeness match what the model actually contains at that revision.

Practitioner insight

The BEP almost always gets written in the first two weeks of a project and then nobody opens it again until there's a fight about whose model was supposed to be at what level. By the time that fight happens, you're usually three months into design and the mismatch is baked into two disciplines' workflows. The plans that actually work get revisited at every phase transition, not just signed once and filed away.

Source: Conversations with structural engineers and BIM managers about coordination requirements on model-driven projects, synthesized from Helonic's structural engineering interviews, Q3 2026.

BIM Execution Plan FAQ

What is a BIM Execution Plan (BEP)?
A BIM Execution Plan is a project-specific document that defines how a team will use building information modeling on a project: who authors which model elements, what Level of Development each element reaches at each project phase, how models from different disciplines federate together, file formats and naming conventions, and who owns model coordination and clash resolution. It's negotiated at project kickoff, typically led by the architect or a BIM manager, and referenced throughout design and construction.
Who is responsible for writing the BEP?
Usually the architect or a designated BIM manager drafts the initial BEP, but it has to be negotiated with every discipline contributing a model: structural, MEP, and often the general contractor and major subcontractors. A BEP written by one party without buy-in from the others tends to fall apart in practice, since it can only govern how a discipline models if that discipline actually agreed to the requirements.
What's the difference between LOD 350 and LOD 400?
LOD 350 shows an element's size, shape, location, and orientation with interfaces to other systems modeled well enough for coordination, which is the level most design-phase models target for clash detection. LOD 400 adds fabrication-level detail, including specific parts, connections, and assembly information, which is what a fabricator or trade contractor typically needs to actually build or manufacture from the model rather than just coordinate around it.
Do I need a BEP if my project is drawing-based rather than model-based?
Not in the traditional sense. Projects that rely on 2D CAD or PDF drawings rather than a shared 3D model don't need the model-authorship and LOD provisions a BEP defines, since there's no federated model to coordinate. That said, some of the same questions still apply in simpler form: who owns which drawing set, what detail level each phase requires, and how disciplines reconcile conflicts, just without the model-specific mechanics.
Why do BIM projects still issue 2D drawings if the model is the source of truth?
Most jurisdictions require 2D PDF sets for permitting, and most field crews still work from printed or PDF sheets rather than navigating a live model on site. That means the 2D set gets extracted from the model at a point in time and then can drift as the model keeps evolving, unless the team has a disciplined process for re-extracting drawings after every significant model change. That drift, not the model itself, is where a lot of BIM-to-field discrepancies originate.
MG

Manas Gandhi

Co-founder & CTO, Helonic

Manas is the co-founder and CTO of Helonic, where he leads engineering and AI research for construction drawing analysis. He works directly with structural, MEP, civil, and fire protection engineers to translate the way they review drawings into AI systems that flag the issues that actually matter in the field. Before Helonic, he built machine learning pipelines for technical document understanding and has spent the last several years interviewing licensed design engineers and discipline leads to ground product decisions in real practice rather than industry assumptions.

Areas of focus
  • AI for technical document understanding
  • Cross-discipline coordination workflows
  • Code compliance automation (IBC, NEC, NFPA, IPC, IMC, ASCE)
  • Structural and MEP drawing review systems

How this page was researched: Reviewed against BIMForum Level of Development (LOD) specification definitions and common BIM Execution Plan structures used on design-build and CM-at-Risk projects.

Last reviewed by Manas Gandhi · August 25, 2026

Catch drift between the model and the issued set

Helonic reads the 2D drawing sets your project actually issues and flags coordination conflicts on the documents crews build from, whatever LOD the source model was at.