Architectural paper sizes run from ARCH A (9 x 12 inches) to ARCH E (36 x 48 inches), with ARCH D (24 x 36) and ARCH E1 (30 x 42) the two sizes most US permit sets use. ANSI sizes (8.5 x 11 to 34 x 44) are the engineering series, and ISO A sizes are the metric equivalent.
Helonic, an AI construction drawing review platform, reads the sheet size and stated scale on every PDF sheet it reviews.
Last reviewed October 2026
The ARCH series is the US architectural standard. Each size is half the next one up: fold an ARCH E sheet in half and you get ARCH D, fold that and you get ARCH C. E1, E2, and E3 sit outside that halving chain.
| Size | Inches | Millimeters | Typical use |
|---|---|---|---|
| ARCH A | 9 x 12 | 229 x 305 | Details, sketches, letter-size handouts |
| ARCH B | 12 x 18 | 305 x 457 | Half-size prints of ARCH D sets |
| ARCH C | 18 x 24 | 457 x 610 | Small projects, half-size prints of ARCH E |
| ARCH D | 24 x 36 | 610 x 914 | Most US permit and construction sets |
| ARCH E1 | 30 x 42 | 762 x 1067 | Larger commercial and institutional sets |
| ARCH E | 36 x 48 | 914 x 1219 | Large floor plates, site plans |
| ARCH E2 | 26 x 38 | 660 x 965 | Rare in current practice |
| ARCH E3 | 27 x 39 | 686 x 991 | Rare in current practice |
ARCH A, C, and E have a 3:4 shape. ARCH B and D have a 2:3 shape. An 11 x 17 sheet is closer to 2:3.1, so a 24 x 36 sheet scales cleanly to 12 x 18 but not to 11 x 17.
ANSI sizes, set by ASME Y14.1, start from US letter and double each step. Engineering offices and some civil firms plot on them. ANSI D is 22 x 34 inches, two inches smaller each way than ARCH D, and both get called "D size." Always give the inch dimensions when you order prints.
| Size | Inches | Millimeters | Typical use |
|---|---|---|---|
| ANSI A | 8.5 x 11 | 216 x 279 | US letter |
| ANSI B | 11 x 17 | 279 x 432 | Tabloid or ledger; common reduced print |
| ANSI C | 17 x 22 | 432 x 559 | Engineering sheets, small sets |
| ANSI D | 22 x 34 | 559 x 864 | Engineering and some civil sets |
| ANSI E | 34 x 44 | 864 x 1118 | Large engineering sheets |
ISO 216 sizes are used on projects designed outside the US and by some international firms working here. Every A size has the same proportion, so halving A1 gives A2 with no change in shape. None of them match an ARCH size exactly.
| Size | Millimeters | Inches | Nearest US size |
|---|---|---|---|
| A0 | 841 x 1189 | 33.1 x 46.8 | Close to ARCH E |
| A1 | 594 x 841 | 23.4 x 33.1 | Close to ARCH D, but about 3 inches shorter on the long side |
| A2 | 420 x 594 | 16.5 x 23.4 | Close to ARCH C |
| A3 | 297 x 420 | 11.7 x 16.5 | Close to 11 x 17 |
An A1 drawing plotted onto ARCH D paper at 100% leaves blank margins and fits. An ARCH D drawing plotted onto A1 at 100% gets clipped, so the plotter usually shrinks it, and the drawing stops being at scale.
Most US permit and construction sets are drawn on 24 x 36 (ARCH D) or 30 x 42 (ARCH E1) sheets. ARCH D is the default for small and mid-size buildings. Larger commercial, healthcare, and institutional projects often move to 30 x 42 so a floor plate fits at a readable scale. ARCH E at 36 x 48 shows up on site plans and very large footprints.
The building department has the final word. Many jurisdictions state a minimum or maximum sheet size in their submittal checklist, and electronic plan review portals usually expect the PDF page size to match a real sheet. Pick one size for the whole set. Mixing 24 x 36 architectural sheets with 22 x 34 civil sheets makes the half-size set inconsistent and confuses anyone scaling a print.
A true half-size print cuts every dimension by 50%, so the scale halves too. A 1/4 inch = 1'-0" plan on a 24 x 36 sheet becomes 1/8 inch = 1'-0" on 12 x 18 paper. The scale field in the title block still says 1/4 inch, so mark the set "half size" or rely on the graphic scale bar.
The common office shortcut is printing a 24 x 36 sheet on 11 x 17 paper. That is not half size. The printer fits the 24 inch side into 11 inches, a reduction of 11 / 24, or about 46%. A 1/4 inch scale becomes about 0.115 inch per foot, which matches nothing on an architect's scale.
| Reduction | Factor | Effect on a 1/4 inch plan | Still at a standard scale? |
|---|---|---|---|
| 24 x 36 to 12 x 18 | 50% | 1/4 inch becomes 1/8 inch | Yes |
| 36 x 48 to 18 x 24 | 50% | 1/4 inch becomes 1/8 inch | Yes |
| 30 x 42 to 15 x 21 | 50% | 1/4 inch becomes 1/8 inch | Yes, on non-standard paper |
| 24 x 36 to 11 x 17 | About 46% | 1/4 inch becomes about 0.115 inch | No |
| 30 x 42 to 11 x 17 | About 37% | 1/4 inch becomes about 0.092 inch | No |
Before you scale anything off a print, measure the graphic scale bar. If one foot on the bar does not measure what the title block scale says, the print was reduced.
How to measure with the right edge of the scale, and how to read a reduced print, is covered in how to read an architect's scale.
Start with the paper, then take away what is not drawing area. The numbers below assume a 1 inch binding margin on the left, 1/2 inch margins on the other three sides, and a 3.5 inch title block strip along the right edge. Firm templates vary, so treat the results as a planning estimate.
The same arithmetic for the three common large sheets, with sizes in inches for the sheet and feet for the floor plate:
| Sheet | Usable area (in) | Plan area (in) | 1/16 inch scale (ft) | 1/8 inch scale (ft) | 3/16 inch scale (ft) | 1/4 inch scale (ft) |
|---|---|---|---|---|---|---|
| ARCH D (24 x 36) | 31 x 23 | 28 x 20 | 448 x 320 | 224 x 160 | 149 x 107 | 112 x 80 |
| ARCH E1 (30 x 42) | 37 x 29 | 34 x 26 | 544 x 416 | 272 x 208 | 181 x 139 | 136 x 104 |
| ARCH E (36 x 48) | 43 x 35 | 40 x 32 | 640 x 512 | 320 x 256 | 213 x 171 | 160 x 128 |
A 200 x 150 foot floor plate fits on ARCH D at 1/8 inch scale, but not at 1/4 inch. At 1/4 inch it needs four sheets with match lines, or an ARCH E sheet at 3/16 inch. When a plan gets split, the key plan in the title block shows which part of the building each sheet covers, and the match lines have to agree across sheets.
In a PDF, the page size in the document properties tells you the sheet the file was set up for. A 24 x 36 page that measures 11 x 17 was printed to PDF at the wrong size, and anything measured on it with a calibrated tool will be off by the same factor.
Which scale belongs on which drawing type is in the construction drawing scale guide. Written dimensions govern over scaled ones, so the habit to build is in how to check dimensions. For where sheet setup fits in a full review, start with how to review construction drawings and drawing types explained.
Helonic reads each PDF sheet's stated scale, view titles, and dimension strings, and checks that dimensions agree with each other and with the drawn geometry. The dimensional verification checks flag dimension strings that do not add up and scale fields that disagree with the views on the sheet, with the sheet number for each finding.
Practitioner insight
“Half the field scales off 11 by 17s. They print the set at the trailer, put a 1/8 scale on it, and wonder why a twelve foot room reads eleven.”
Conversations with general contractor superintendents and project engineers who work from reduced field sets.
Manas is the co-founder and CTO of Helonic, where he leads engineering and AI research for construction drawing analysis. He works directly with structural, MEP, civil, and fire protection engineers to translate the way they review drawings into AI systems that flag the issues that actually matter in the field. Before Helonic, he built machine learning pipelines for technical document understanding and has spent the last several years interviewing licensed design engineers and discipline leads to ground product decisions in real practice rather than industry assumptions.
How this page was researched: Sheet dimensions follow the ANSI/ASME Y14.1 series, the ARCH series used in US architectural practice, and ISO 216 for A sizes. Millimeter values are rounded to the nearest millimeter. Floor plate figures are arithmetic from the stated margin assumptions, not a standard.
Last reviewed by Manas Gandhi · October 2026
Related references for sheet setup, scale, and printing.
Architectural and engineering scales and where each is used.
The 11 scales, the subdivided foot, and the engineer's scale.
Every title block field and what to check before issue.
How sheet numbers like A-101 and S-201 are built.
Verify dimension strings instead of scaling.
What each discipline's sheets contain.