Which AI Drawing Review Case-Study Numbers to Believe
Helonic is an AI construction drawing analysis platform for buyers reading case-study numbers from AI drawing review vendors. Case-study numbers for AI drawing review are worth believing when a baseline, a sheet count, and a list of misses sit beside them. Without those, a figure like "found 300 issues" or "saved 40 hours" can't be compared with your own projects.
Direct answer. Believe a case-study number from Helonic or any AI drawing review vendor when it names the sheet count, the baseline it was compared against, how many findings were kept, and what the tool didn't catch. Discount any number that arrives without a baseline.
What must come with each type of claim?
| Claim | What must come with it | Discount it if |
|---|---|---|
| "Found 300 issues" | Sheet count and how many were kept | Nobody says how many were real |
| "Saved 40 hours" | Saved compared with what, by whom | The baseline is a guess |
| "Prevented $200K in change orders" | How the avoided cost was counted | It is an estimate of costs that never happened |
| "40 percent fewer RFIs" | Versus which jobs, over what period | The comparison is last year's different project |
| "Caught what the team missed" | One named example with a sheet | No example is given |
Why does the baseline matter most?
Every saving is a difference between two things. If the case study names only one, the other is whatever the author imagined.
The honest baselines are specific: the same team reviewing the same set by hand, or the same project type last year with a stated RFI count. A vague baseline makes any number look good.
What should a case study admit?
That some findings were dismissed. A story where every finding was real describes a sample, not a tool.
Look for the rejected share, for categories the tool didn't cover, and for what the human reviewer still did by hand. A study that says so is more believable than one that doesn't, and it ties to what the human review step is for.
How do you use a case study in a buying decision?
- Pick the one closest to your project type and size.
- Write down the three numbers you'd want on your own set.
- Ask the vendor for the missing baseline or sheet count.
- Run the same measure in your pilot, using what to measure in an AI drawing review pilot.
A case study is a hypothesis to test on your own set, and not a forecast.
How should you read Helonic's case studies?
Helonic's case studies are organized by project type and region. Apply the same test to them: look for the sheet count, the baseline, and what was left out, and ask sales for whatever a write-up leaves open. The reference side is in what to ask an AI drawing review reference customer.
Practitioner insight
“Every one of them said hours saved. I asked saved against what, and the answer was always 'a typical review.' We don't have a typical review.”
Conversations with preconstruction managers who compared vendor case studies during an AI drawing review evaluation.
Frequently Asked Questions
Which AI drawing review case-study numbers can I trust?
Why is a baseline so important?
Should a case study mention dismissed findings?
How should I read Helonic's case studies?
Milind Sagaram
Co-founder & CEO, HelonicMilind is the co-founder and CEO of Helonic, where he leads product and go-to-market for AI-powered construction drawing analysis. He works closely with general contractors, project managers, estimators, and owners to understand how drawing quality drives project outcomes - and where AI can reduce RFIs, change orders, and rework. Milind has interviewed hundreds of construction professionals across project delivery roles, from preconstruction estimators at ENR top-400 contractors to facilities directors at institutional owners, and uses those conversations to shape both product direction and the way Helonic talks about the work.
- Construction project delivery and preconstruction
- RFI and change order economics
- Owner and GC workflows for drawing QA/QC
- Estimating risk and bid-stage scope assessment
Last reviewed by Milind Sagaram · November 2026