HelonicHelonic

Protect structural integrity from day one

Verify penetrations, connections, and coordination before they become field problems. Helonic reads structural, MEP, and architectural sheets together so issues never reach the fabricator.

What slows down structural engineers

The recurring coordination problems that turn into RFIs, rework, and structural risk.

MEP Penetrations

Unauthorized or poorly located penetrations compromise structural members and require costly remediation.

Dimension Verification

Mismatched dimensions between structural and architectural drawings lead to field conflicts.

Connection Details

Missing or incomplete connection details delay steel fabrication and erection sequences.

How Helonic helps

Where AI drawing review plugs into your structural QA/QC and consultant coordination workflow.

1

MEP Penetration Review

Cross-reference MEP routing plans against structural framing to identify penetrations that violate reinforcement zones, exceed allowable opening sizes, or lack proper reinforcement details.

2

Load Path Verification

Trace load paths from roof to foundation and flag discontinuities, missing members, or transfer conditions that are not detailed. Ensure lateral systems are continuous and properly braced.

3

Connection Detail Checking

Verify that every beam-to-column, beam-to-beam, and brace connection has an associated detail. Flag typical connections that may not apply to specific conditions.

4

Foundation Coordination

Check foundation plans against civil utility locations, MEP underground routing, and architectural slab edge conditions. Prevent conflicts between footings and underground infrastructure.

5

Structural Note Consistency

Ensure general notes, material specifications, and design criteria are consistent across all structural sheets and align with the project geotechnical report and building code requirements.

Common issues we catch

The structural-specific issues that turn into rework if they make it to the fabricator.

Coordination Conflicts

  • Unauthorized MEP penetrations through beams and columns
  • Dimension mismatches between structural and architectural
  • Foundation conflicts with underground utilities
  • Slab edge conditions not coordinated with architecture

Detailing Issues

  • Missing connection details at non-typical conditions
  • Incomplete reinforcement schedules
  • Inconsistent member sizes across plan and elevation views
  • Missing or unclear embed and anchor details

ROI for structural engineers

What teams running Helonic on structural sets are seeing across projects.

AVOIDED REWORK
$40K–$300K
In avoided rework per project.
CONFLICTS
30+
Structural conflicts identified per project.
FASTER REVIEW
90%
Faster penetration review vs manual.

Keep exploring

Related guides and adjacent solutions.

Protect structural integrity from day one

See how Helonic helps structural engineers catch coordination conflicts before steel is fabricated.