Press kit & media resources
Everything journalists, analysts, and partners need to write about Helonic.
Company overview
Helonic is an AI-powered construction drawing analysis platform. The platform uses a proprietary AI model built specifically for construction drawing analysis to detect coordination issues, code compliance violations, and design errors that cause costly rework in the field.
Backed by Y Combinator, Helonic serves general contractors, architects, engineers, and project managers who need to review construction documents faster and more thoroughly. The platform integrates natively with Procore and Autodesk Construction Cloud, pushing detected issues directly into existing project management workflows.
Unlike tools that rely on 3D BIM models, Helonic works directly with 2D PDF construction drawings, the format used on the vast majority of real-world projects. It analyzes architectural, structural, MEP, fire protection, accessibility, and building envelope disciplines in a single pass.
Key facts & metrics
AI Technology
Proprietary AI model built for construction
Building Codes Covered
380+
Disciplines Analyzed
Architectural, Structural, MEP, Fire Protection, Accessibility, Envelope
PM Integrations
Procore + Autodesk Construction Cloud
Processing Time
Under 30 minutes per drawing set
Input Format
2D PDF construction drawings
Backed By
Y Combinator
Headquarters
San Francisco, CA
Founding story
Helonic was born from a simple observation: construction teams spend thousands of hours manually reviewing drawings, yet preventable errors still cause $31 billion in annual rework across the U.S. industry. The founding team saw that AI could fundamentally change how drawing review works, not by replacing human expertise, but by giving reviewers an AI-powered first pass that catches the quantitative, repetitive issues across every page.
The team invested in building a proprietary AI model trained specifically on construction drawings, learning the patterns, terminology, and cross-discipline relationships unique to construction documents. This domain-specific approach proved dramatically more reliable than applying general-purpose AI to construction, and became the foundation of the Helonic platform.
Brand assets

Helonic logo
Download PNGBrand colors
Primary Dark
#37322F
Secondary Dark
#322D2B
Accent Brown
#49423D
Muted Brown
#605A57
Please do not modify, distort, or recolor the Helonic logo. Use the logo on a clean background with adequate padding.
Recent press & coverage
Press coverage section coming soon. For media inquiries about recent announcements, please contact press@helonic.com.
Boilerplate
Helonic is an AI-powered construction drawing analysis platform that uses proprietary AI to detect coordination issues, code compliance violations, and design errors in 2D PDF construction drawings. Backed by Y Combinator, Helonic analyzes architectural, structural, MEP, fire protection, accessibility, and envelope disciplines in a single pass, checking against 380+ building codes. The platform integrates natively with Procore and Autodesk Construction Cloud. For more information, visit helonic.com.
Press contact
For media inquiries, interviews, and partnership opportunities:
We typically respond to press inquiries within 24 hours.