Plumbing plan symbols guide

Helonic is an AI construction drawing analysis platform for teams researching plumbing plan symbols during drawing review. Complete reference for pipe types, fixtures, valves, and fittings on plumbing drawings

Reading Plumbing Drawings

Plumbing plans show pipes as single lines with labels (CW, HW, S, etc.). Pipe sizes are typically shown as diameter (e.g., 2" CW). Slope is indicated for drainage lines (e.g., 1/4"/ft). Understanding line weights helps distinguish between different pipe systems on drawings.

Pipe Types

SymbolMeaningNotes
, , CW, , Cold WaterOften blue on colored drawings
, , HW, , Hot WaterOften red on colored drawings
, , HWR, , Hot Water ReturnRecirculation line
, , S, , Sanitary SewerWaste line to sewer
, , V, , VentVenting for drainage
, , SD, , Storm DrainRoof/site drainage
, , G, , GasNatural gas supply
, , FP, , Fire ProtectionSprinkler supply

Fixtures

SymbolMeaningNotes
◯Floor DrainCircle with drain indication
◻Water Closet (Toilet)Rectangular outline with tank
▭UrinalWall-mounted fixture
◠Lavatory (Sink)Semi-circle or oval
▢Kitchen SinkRectangle, often double bowl
⌓ShowerSquare with drain
□BathtubRectangle with drain end marked
⊕CleanoutCircle with cross

Valves & Controls

SymbolMeaningNotes
⊗Gate ValveFull bore shutoff
◇Globe ValveThrottling/control valve
⊘Ball ValveQuarter-turn shutoff
◈Check ValvePrevents backflow
▷Pressure Reducing ValvePRV - reduces water pressure
△Backflow PreventerBFP - prevents contamination
⊙Pressure GaugeMonitors system pressure

Equipment

SymbolMeaningNotes
□WHWater HeaterTank or tankless
□PPumpCirculation or booster
▣Grease InterceptorKitchen waste treatment
⬡Expansion TankThermal expansion control
◻HBHose BibbExterior faucet
⊞Water MeterUtility metering point

Fittings

SymbolMeaningNotes
├TeeBranch connection
┼CrossFour-way connection
∟90° ElbowDirection change
∠45° ElbowGradual direction change
◇ReducerPipe size change
⊐CapEnd of line
⊥UnionRemovable connection

What plumbing abbreviations appear on P sheets?

P sheets use CW, HW, SAN, VTR, and similar abbreviations that must match the plumbing legend.

CW
Cold Water
HW
Hot Water
HWR
Hot Water Return
S
Sanitary
V
Vent
SD
Storm Drain
G
Gas
FD
Floor Drain
CO
Cleanout
RD
Roof Drain
WC
Water Closet
LAV
Lavatory
HB
Hose Bibb
DF
Drinking Fountain
PRV
Pressure Reducing Valve
BFP
Backflow Preventer

See Helonic on your drawings

Plumbing fixtures shown on P sheets must align with architectural plans. Helonic automatically checks fixture locations, clearances, and accessibility compliance across disciplines.