How Drawing Review Cut Repeat Errors on Atlanta Affordable Housing

  • Four affordable housing sets reused unit types whose waste stacks missed the slab openings on every floor.
  • Helonic checked the repeating stacks on the PDF sets and counted every floor that copied the miss.
  • The firm cleared 692 issues and kept an estimated $340,000 of repeated stack fixes out of construction.

Atlanta, GA. 692 issues across 4 projects.

Issues Detected

692 across 4 sets

Projects

Four Atlanta sites

Estimated Savings

$340K repeated fixes

692 Repeated Errors Across Four Affordable Housing Sets

An architecture firm had four affordable housing jobs in Atlanta under one funding calendar. Each set reused a handful of unit types, stacked floor over floor.

Waste stacks on the plumbing sheets missed the slab openings on three of the four buildings. The same miss showed up in every stacked copy of the unit. That is a core drill on every floor, not a note on a code sheet.

A correction in one typical unit had to be proven on every copy, or the housing review would comment on each building separately.

Helonic Counted the Stack Misses Before They Were Cored

They uploaded all four PDF sets. Helonic checked one unit type, then counted the floors and buildings that copied the same stack miss and the same rated-wall tag.

The combined list was 692 issues. Most of the money was stack alignment. Code notes on baths and wall tags were in the list and were not the coring.

Findings were grouped by unit type so one redline could be applied to every copy.

See how to review construction drawings, AI for construction drawings, 2D clash detection, california k-12 drawing review, salt lake restaurant drawing review, and seattle apartment drawing review.

$340,000 in Repeated Stack Fixes Kept Off the Job

The firm fixed the typical stacks and the assembly numbers before the housing packages went out. Review after the fix covered the unit types, not every repeated plan.

They estimated $340,000 if those stack misses had been cored on site across the four buildings.

The housing review still asked for accessibility dimensions in one community room. The repeated unit stacks were not in the comments.

“One bad stack in a typical unit is four buildings of the same bad stack. Helonic counted 692 copies of those errors before the Atlanta sets went in.”

Housing Studio Lead, Architecture FirmHousing Studio Lead on this affordable housing set in Atlanta, GA.

Frequently asked questions

Does this replace a Georgia housing review?

No. The firm used it to fix the repeating waste stacks before the housing package. The agency still reviews the set.

Where did the 692 issues come from?

Four completed Helonic reviews. The same unit types and the same stack misses showed up on each Atlanta job, and 692 is the combined count.

How is this different from a single multifamily story?

This one is an architecture firm checking four Atlanta affordable housing sets, not a contractor GMP review of one Denver building.

MG

Manas Gandhi

Co-founder & CTO, Helonic

Manas is the co-founder and CTO of Helonic, where he leads engineering and AI research for construction drawing analysis. He works directly with structural, MEP, civil, and fire protection engineers to translate the way they review drawings into AI systems that flag the issues that actually matter in the field. Before Helonic, he built machine learning pipelines for technical document understanding and has spent the last several years interviewing licensed design engineers and discipline leads to ground product decisions in real practice rather than industry assumptions.

Areas of focus
  • AI for technical document understanding
  • Cross-discipline coordination workflows
  • Code compliance automation (IBC, NEC, NFPA, IPC, IMC, ASCE)
  • Structural and MEP drawing review systems

How this page was researched: Reviewed against Helonic's 2026 drawing-analysis categories, RFI workflow, and product capabilities.

Last reviewed by Manas Gandhi · September 17, 2026

See what Helonic catches on your drawings

Upload your PDF set and we'll walk you through every coordination conflict, code gap, and dimension mismatch our AI flags.