NYC BC×MEP

NYC BC MEP compliance check

Helonic checks mep construction drawings against New York City Building Code to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.

About New York City Building Code

New York City's independent building code with NYC-specific requirements that differ significantly from the IBC. Covers unique provisions for high-rise, mixed-use, and the city's complex zoning resolution.

Scope

All construction in the five boroughs of New York City

Editions

2022 NYC Building Code (current)

Applicability

Mandatory in NYC. Uses its own code (not the NYS code) with DOB enforcement.

What we check for

NYC BC compliance checking for mep drawings
Cross-reference mep details against New York City Building Code requirements
Verify mep specifications meet NYC BC minimum standards
Check mep coordination against NYC BC referenced standards
Identify mep issues that could cause NYC BC compliance failures
Review mep drawings for common NYC BC violations

Common MEP issues we catch

Combined mechanical, electrical, and plumbing drawings for all building systems coordination.

!
Ductwork routing through structural beams
!
Conduit and piping elevation conflicts
!
Insufficient ceiling plenum space
!
Electrical panel access clearance violations
!
Plumbing vent termination conflicts with equipment
!
Equipment access and maintenance space deficiencies
!
Fire damper locations at rated assemblies

Why NYC BC MEP compliance matters

New York City Building Code compliance for mep drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching NYC BC mep issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).

How Helonic checks NYC BC compliance

1

Upload your PDF drawings

Upload your mep PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.

2

Purpose-built construction AI

Helonic's AI is trained specifically to review construction drawings against NYC BC requirements. Domain-specific training catches issues that generic AI tools miss.

3

Exact issue locations

Every NYC BC compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.

4

One-click RFI generation

Turn detected NYC BC issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.

Related resources

NYC BC checks for other disciplines

MEP checks against other codes

Check your mep drawings against NYC BC

Upload your PDF drawings and our AI checks them for New York City Building Code compliance, automatically.