CBC×MEP

CBC MEP compliance check

Helonic checks mep construction drawings against California Building Code (Title 24 Part 2) to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.

About California Building Code (Title 24 Part 2)

California's state building code based on the IBC with extensive California-specific amendments for seismic, energy, accessibility, and green building requirements.

Scope

All construction in California

Editions

2022 CBC (based on 2021 IBC), 2019 CBC

Applicability

Mandatory for all construction in California. One of the most amended state codes in the US.

What we check for

CBC compliance checking for mep drawings
Cross-reference mep details against California Building Code (Title 24 Part 2) requirements
Verify mep specifications meet CBC minimum standards
Check mep coordination against CBC referenced standards
Identify mep issues that could cause CBC compliance failures
Review mep drawings for common CBC violations

Common MEP issues we catch

Combined mechanical, electrical, and plumbing drawings for all building systems coordination.

!
Ductwork routing through structural beams
!
Conduit and piping elevation conflicts
!
Insufficient ceiling plenum space
!
Electrical panel access clearance violations
!
Plumbing vent termination conflicts with equipment
!
Equipment access and maintenance space deficiencies
!
Fire damper locations at rated assemblies

Why CBC MEP compliance matters

California Building Code (Title 24 Part 2) compliance for mep drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching CBC mep issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).

How Helonic checks CBC compliance

1

Upload your PDF drawings

Upload your mep PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.

2

Purpose-built construction AI

Helonic's AI is trained specifically to review construction drawings against CBC requirements. Domain-specific training catches issues that generic AI tools miss.

3

Exact issue locations

Every CBC compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.

4

One-click RFI generation

Turn detected CBC issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.

Related resources

CBC checks for other disciplines

MEP checks against other codes

Check your mep drawings against CBC

Upload your PDF drawings and our AI checks them for California Building Code (Title 24 Part 2) compliance, automatically.