NEC MEP compliance check
Helonic checks mep construction drawings against National Electrical Code (NFPA 70) to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.
About National Electrical Code (NFPA 70)
The US standard for electrical installations including wiring, overcurrent protection, grounding, and equipment. Adopted by most jurisdictions as the basis for electrical code enforcement.
Scope
Electrical installations in all building types
Editions
2023 NEC, 2020, 2017, 2014
Applicability
Adopted in nearly all US jurisdictions. Some states lag by one or two editions.
What we check for
Common MEP issues we catch
Combined mechanical, electrical, and plumbing drawings for all building systems coordination.
Why NEC MEP compliance matters
National Electrical Code (NFPA 70) compliance for mep drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching NEC mep issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).
How Helonic checks NEC compliance
Upload your PDF drawings
Upload your mep PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.
Purpose-built construction AI
Helonic's AI is trained specifically to review construction drawings against NEC requirements. Domain-specific training catches issues that generic AI tools miss.
Exact issue locations
Every NEC compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.
One-click RFI generation
Turn detected NEC issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.