NEC Architectural compliance check

Helonic checks architectural construction drawings against National Electrical Code (NFPA 70) to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.

About National Electrical Code (NFPA 70)

The US standard for electrical installations including wiring, overcurrent protection, grounding, and equipment. Adopted by most jurisdictions as the basis for electrical code enforcement.

Scope

Electrical installations in all building types

Editions

2023 NEC, 2020, 2017, 2014

Applicability

Adopted in nearly all US jurisdictions. Some states lag by one or two editions.

What we check for

NEC compliance checking for architectural drawings
Cross-reference architectural details against National Electrical Code (NFPA 70) requirements
Verify architectural specifications meet NEC minimum standards
Check architectural coordination against NEC referenced standards
Identify architectural issues that could cause NEC compliance failures
Review architectural drawings for common NEC violations

Common Architectural issues we catch

Architectural drawings including floor plans, elevations, sections, details, and interior finishes.

!
Occupancy classification errors
!
Egress path and exit width deficiencies
!
Fire-rating discontinuities at walls and floors
!
Door and hardware schedule mismatches
!
Finish schedule conflicts
!
Accessibility route and clearance violations
!
Building height and area limit exceedances

Why NEC Architectural compliance matters

National Electrical Code (NFPA 70) compliance for architectural drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching NEC architectural issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).

How Helonic checks NEC compliance

1

Upload your PDF drawings

Upload your architectural PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.

2

Purpose-built construction AI

Helonic's AI is trained specifically to review construction drawings against NEC requirements. Domain-specific training catches issues that generic AI tools miss.

3

Exact issue locations

Every NEC compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.

4

One-click RFI generation

Turn detected NEC issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.

Related resources

NEC checks for other disciplines

Architectural checks against other codes

Check your architectural drawings against NEC

Upload your PDF drawings and our AI checks them for National Electrical Code (NFPA 70) compliance, automatically.