ASHRAE 90.1 Structural compliance check
Helonic checks structural construction drawings against ASHRAE Standard 90.1 - Energy Standard for Buildings to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.
About ASHRAE Standard 90.1 - Energy Standard for Buildings
The ASHRAE energy standard for commercial buildings, widely referenced by the IECC and many state energy codes. Covers building envelope, HVAC, service water heating, power, lighting, and renewable energy requirements.
Scope
Energy efficiency for commercial buildings (non-residential and high-rise residential)
Editions
ASHRAE 90.1-2022, 2019, 2016, 2013
Applicability
Referenced by the IECC as a compliance pathway. Adopted directly by some states and federal agencies (GSA, DOD).
What we check for
Common Structural issues we catch
Structural drawings including foundations, framing plans, connection details, and lateral systems.
Why ASHRAE 90.1 Structural compliance matters
ASHRAE Standard 90.1 - Energy Standard for Buildings compliance for structural drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching ASHRAE 90.1 structural issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).
How Helonic checks ASHRAE 90.1 compliance
Upload your PDF drawings
Upload your structural PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.
Purpose-built construction AI
Helonic's AI is trained specifically to review construction drawings against ASHRAE 90.1 requirements. Domain-specific training catches issues that generic AI tools miss.
Exact issue locations
Every ASHRAE 90.1 compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.
One-click RFI generation
Turn detected ASHRAE 90.1 issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.