ASHRAE 90.1×Plumbing

ASHRAE 90.1 Plumbing compliance check

Helonic checks plumbing construction drawings against ASHRAE Standard 90.1 - Energy Standard for Buildings to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.

About ASHRAE Standard 90.1 - Energy Standard for Buildings

The ASHRAE energy standard for commercial buildings, widely referenced by the IECC and many state energy codes. Covers building envelope, HVAC, service water heating, power, lighting, and renewable energy requirements.

Scope

Energy efficiency for commercial buildings (non-residential and high-rise residential)

Editions

ASHRAE 90.1-2022, 2019, 2016, 2013

Applicability

Referenced by the IECC as a compliance pathway. Adopted directly by some states and federal agencies (GSA, DOD).

What we check for

ASHRAE 90.1 compliance checking for plumbing drawings
Cross-reference plumbing details against ASHRAE Standard 90.1 - Energy Standard for Buildings requirements
Verify plumbing specifications meet ASHRAE 90.1 minimum standards
Check plumbing coordination against ASHRAE 90.1 referenced standards
Identify plumbing issues that could cause ASHRAE 90.1 compliance failures
Review plumbing drawings for common ASHRAE 90.1 violations

Common Plumbing issues we catch

Plumbing supply, drainage, venting, medical gas, and fire suppression water supply drawings.

!
Drainage slope and sizing errors
!
Vent system termination and sizing issues
!
Fixture count vs occupancy mismatch
!
Backflow prevention device omissions
!
Water heater clearance and venting errors
!
Grease interceptor sizing deficiencies
!
Cross-connection control violations

Why ASHRAE 90.1 Plumbing compliance matters

ASHRAE Standard 90.1 - Energy Standard for Buildings compliance for plumbing drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching ASHRAE 90.1 plumbing issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).

How Helonic checks ASHRAE 90.1 compliance

1

Upload your PDF drawings

Upload your plumbing PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.

2

Purpose-built construction AI

Helonic's AI is trained specifically to review construction drawings against ASHRAE 90.1 requirements. Domain-specific training catches issues that generic AI tools miss.

3

Exact issue locations

Every ASHRAE 90.1 compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.

4

One-click RFI generation

Turn detected ASHRAE 90.1 issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.

Related resources

ASHRAE 90.1 checks for other disciplines

Plumbing checks against other codes

Check your plumbing drawings against ASHRAE 90.1

Upload your PDF drawings and our AI checks them for ASHRAE Standard 90.1 - Energy Standard for Buildings compliance, automatically.