ADA×MEP

ADA MEP compliance check

Helonic checks mep construction drawings against ADA Standards for Accessible Design to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.

About ADA Standards for Accessible Design

Federal accessibility standards required for all public accommodations and commercial facilities. Covers accessible routes, restrooms, parking, signage, and communication features.

Scope

Public accommodations, commercial facilities, state and local government facilities

Editions

2010 ADA Standards (current)

Applicability

Federal law - applies to all new construction and alterations of public and commercial buildings nationwide.

What we check for

ADA compliance checking for mep drawings
Cross-reference mep details against ADA Standards for Accessible Design requirements
Verify mep specifications meet ADA minimum standards
Check mep coordination against ADA referenced standards
Identify mep issues that could cause ADA compliance failures
Review mep drawings for common ADA violations

Common MEP issues we catch

Combined mechanical, electrical, and plumbing drawings for all building systems coordination.

!
Ductwork routing through structural beams
!
Conduit and piping elevation conflicts
!
Insufficient ceiling plenum space
!
Electrical panel access clearance violations
!
Plumbing vent termination conflicts with equipment
!
Equipment access and maintenance space deficiencies
!
Fire damper locations at rated assemblies

Why ADA MEP compliance matters

ADA Standards for Accessible Design compliance for mep drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching ADA mep issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).

How Helonic checks ADA compliance

1

Upload your PDF drawings

Upload your mep PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.

2

Purpose-built construction AI

Helonic's AI is trained specifically to review construction drawings against ADA requirements. Domain-specific training catches issues that generic AI tools miss.

3

Exact issue locations

Every ADA compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.

4

One-click RFI generation

Turn detected ADA issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.

Related resources

ADA checks for other disciplines

MEP checks against other codes

Check your mep drawings against ADA

Upload your PDF drawings and our AI checks them for ADA Standards for Accessible Design compliance, automatically.