CBC Mechanical compliance check
Helonic checks mechanical construction drawings against California Building Code (Title 24 Part 2) to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.
About California Building Code (Title 24 Part 2)
California's state building code based on the IBC with extensive California-specific amendments for seismic, energy, accessibility, and green building requirements.
Scope
All construction in California
Editions
2022 CBC (based on 2021 IBC), 2019 CBC
Applicability
Mandatory for all construction in California. One of the most amended state codes in the US.
What we check for
Common Mechanical issues we catch
HVAC, exhaust, ventilation, and refrigeration drawings.
Why CBC Mechanical compliance matters
California Building Code (Title 24 Part 2) compliance for mechanical drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching CBC mechanical issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).
How Helonic checks CBC compliance
Upload your PDF drawings
Upload your mechanical PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.
Purpose-built construction AI
Helonic's AI is trained specifically to review construction drawings against CBC requirements. Domain-specific training catches issues that generic AI tools miss.
Exact issue locations
Every CBC compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.
One-click RFI generation
Turn detected CBC issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.