AI plan check in New York, NY

Helonic is an AI construction drawing analysis platform for plan reviewers and project teams pulling permits in New York, NY.

New York does not use the IBC in any form an out-of-town team would recognize. The 2022 NYC Building Code descends from the 2015 IBC but has been rewritten deeply enough, and paired with a city-specific Energy Conservation Code, Mechanical Code, and Plumbing Code, that a set drafted in model code language draws objections on vocabulary alone. The Department of Buildings is also only one of the reviewers, since FDNY, the Landmarks Preservation Commission, and the Zoning Resolution all shape the same drawings.

For New York, NY construction teams. Last reviewed August 2026.

Why does New York's building code matter for the drawing set?

New York City writes its own code. The 2022 NYC Building Code is derived from the 2015 IBC, but the amendments run deep enough that section numbers, defined terms, and whole chapters diverge, and the NYC Energy Conservation Code, NYC Mechanical Code, and NYC Plumbing Code are similarly independent documents. Three additional layers change the drawing set. Local Laws sit above the code and carry their own documentation: Local Law 97 puts emissions limits on large buildings that the energy model and mechanical selections have to answer, facade inspection requirements govern the exterior wall over the building's life, and laws such as Local Law 144 attach obligations to the project rather than the design. FDNY separately reviews and approves fire protection systems, so sprinkler, standpipe, alarm, and smoke control scope answers to two authorities. And the Zoning Resolution controls bulk, floor area ratio, setbacks, sky exposure, and permitted use, which makes the zoning analysis sheet a code sheet in New York rather than a courtesy.

Adopted Code
2022 NYC Building Code - independent code based on 2015 IBC with extensive NYC-specific provisions
Permit Authority (AHJ)
NYC Department of Buildings (DOB)
Standard Plan-Check Timeline
6 to 20+ weeks depending on project type; professional certification available
Population
8.3M

How does the NYC Department of Buildings (DOB) review construction drawings?

DOB review runs from roughly 6 weeks on a straightforward alteration to 20 weeks or more on a new building, and the total is rarely a single number because filings move through plan examination, objections, and appointments rather than one pass. Professional certification lets a registered design professional certify compliance and skip plan examination, which is the fastest route and also the one carrying personal exposure if an audit finds a defect, so it rewards a set that has already been screened hard. Beyond DOB, FDNY reviews fire protection, and a designated building or one in a historic district needs Landmarks Preservation Commission approval before DOB will act on exterior work. Sequencing is what hurts: an objection at plan examination is an appointment away, a Landmarks issue is a hearing calendar away, and an FDNY comment can land after the building work is already approved.

What plan-check issues are common in New York?

The most expensive New York mistake is filing a set written to the model IBC. Egress tables, occupancy classifications, and section citations that would be correct anywhere else read as wrong here, and clearing those objections is tedious because each one has to be re-cited to the NYC provision. Second, mechanical and energy documentation that ignores the city codes and Local Law 97, so equipment selections and the energy model get redone rather than annotated. Third, fire protection scope drawn for building review only, with no FDNY submission planned, which surfaces late and can move a standpipe or a fire command center. Fourth, exterior work on a designated or historic-district building where windows, storefront, or a rooftop addition were designed before Landmarks weighed in. Fifth, zoning, where floor area, setback, or use assumptions do not survive a careful reading of the Zoning Resolution, which is a redesign rather than a correction. Alteration work adds a sixth, since the existing building's prior approvals and legal use have to be established before the new work can be evaluated at all.

New York Construction Conditions
NYC Building Code is independent: not IBC-based in standard form
Local Laws (LL97, LL144, etc.) for energy, emissions, and facade inspection
FDNY review required for fire protection systems
Landmarks Preservation Commission review for designated buildings
Zoning resolution affects bulk, FAR, setbacks, and use

What project types does New York permit most?

High-rise commercial and residential towers concentrate nearly every New York requirement into one set: zoning bulk, curtain wall and facade compliance, egress and elevator recall, FDNY-reviewed standpipe and smoke control, and Local Law 97 emissions, all at once. Infrastructure and transit work runs under other agencies' standards and touches DOB where it meets buildings. Affordable housing carries program requirements alongside the code and usually the tightest schedule, which makes professional certification attractive and pre-filing screening more valuable. Adaptive reuse, including office to residential conversion, is where existing-building provisions, light and air requirements, egress in a structure never designed for it, and often Landmarks all collide. Interior alterations look modest and still trigger accessibility, egress, and energy compliance for the affected area. The governing rule set changes with each of those, so a check is only useful if it follows the filing type on the sheets.

Top Project Types in New York
High-rise commercial/residentialInfrastructureTransitAffordable housingAdaptive reuse

What do New York teams ask about plan check?

What building code does New York City use?

The 2022 NYC Building Code, which is an independent code derived from the 2015 IBC with extensive city-specific provisions. The NYC Energy Conservation Code, NYC Mechanical Code, and NYC Plumbing Code are likewise city-specific documents. Designing and citing to the model IBC instead of the NYC provisions is a reliable way to collect objections at plan examination.

How long does DOB plan examination take?

Roughly 6 weeks for a straightforward alteration and 20 weeks or more for a new building, though the honest answer depends on how many objection and appointment cycles a filing goes through. Each cycle adds calendar time rather than a same-day turnaround, which is why a set that clears on the first examination is worth a great deal in New York.

What is professional certification and should I use it?

Professional certification lets a registered design professional certify that the filing complies, skipping plan examination and its queue. It is the fastest path through DOB and it moves the risk onto the certifying professional if an audit finds a defect. That tradeoff makes independent screening of the set before filing more valuable, not less.

When does FDNY need to review my drawings?

Fire protection systems including sprinkler, standpipe, alarm, and smoke control require FDNY review and approval separately from DOB. Teams that plan only for the building filing discover this late, and an FDNY comment can relocate a standpipe, a siamese connection, or a fire command center after the architectural work is already approved.

How do Local Laws like LL97 affect the drawing set?

Local Law 97 sets emissions limits on large buildings, so the energy model, envelope performance, and mechanical equipment selections have to add up to a compliant result rather than a stated intent. Facade inspection requirements shape the exterior wall over the building's life, and laws such as Local Law 144 attach reporting and hiring obligations to the project. The drawings should already carry the systems and documentation those laws assume.

How does AI plan check help on a New York project?

Helonic screens the filing set against the 2022 NYC Building Code and the city's Energy, Mechanical, and Plumbing Codes in minutes, checking egress and occupancy analysis against the NYC provisions rather than the model IBC, flagging fire protection scope needing FDNY review, energy and Local Law 97 documentation gaps, Landmarks conflicts, and zoning assumptions the drawings do not support, with a sheet and section on each finding. Helonic is a screening tool; the licensed Engineer of Record retains design responsibility and the Department of Buildings retains approval authority.