AI plan check in Boulder, CO

Helonic is an AI construction drawing analysis platform for plan reviewers and project teams pulling permits in Boulder, CO.

Boulder enforces one of the most demanding local code packages in the country, and it does so on top of a code base that changed recently: the 2024 ICC suite took effect August 1, 2025, and the 2024 City of Boulder Energy Conservation Code took effect December 1, 2024. City of Boulder Planning and Development Services applies CoBECC requirements that make new buildings all-electric with limited exceptions and require ERI or EUI compliance documentation at permit application, and design requirements are pinned to the permit submittal date. AI plan check screens the set against that package before the first review cycle.

For Boulder, CO construction teams. Last reviewed August 2026.

Why does Boulder's building code matter for the drawing set?

Boulder runs the 2024 ICC suite, effective August 1, 2025, alongside the 2024 City of Boulder Energy Conservation Code, effective December 1, 2024, and CoBECC is the piece that changes the design. New buildings are required to be all-electric with limited exceptions, so gas heating, gas water heating, and gas cooking come off the drawings and the consequences land on the electrical set: larger service, more panel capacity, different equipment rooms, and heat pump equipment selected for a cold, high-altitude climate. Compliance runs through ERI or EUI paths with documentation required at permit application, which means the energy model, the envelope assemblies, the glazing ratios, and the equipment selections all have to agree with one another at submittal instead of being reconciled later. Because requirements are set by permit submittal date, a project that shifts its submittal can shift its obligations. Two jurisdictional points matter as well: the city limits and unincorporated Boulder County are separate jurisdictions with different requirements, and the city's charter height limit constrains massing in a way most Front Range cities do not.

Adopted Code
2024 ICC suite of codes (effective August 1, 2025) plus the 2024 City of Boulder Energy Conservation Code (CoBECC, effective December 1, 2024)
Permit Authority (AHJ)
City of Boulder Planning & Development Services
Standard Plan-Check Timeline
4 to 10 weeks for standard plan review
Population
105K

How does the City of Boulder Planning & Development Services review construction drawings?

Standard plan review in Boulder generally runs 4 to 10 weeks, the longest baseline among the Colorado cities covered here, and the energy review is a substantive technical review rather than a document check. Planning and Development Services examines the ERI or EUI submission against the drawn assemblies and the scheduled equipment, so an energy model that assumed better glazing or a different heat pump than the sheets show generates a real correction. Confirm the jurisdiction before anything else, because a site inside city limits and a site in unincorporated Boulder County carry different requirements and different reviewers, and the boundary is not always obvious. Site constraints add their own pressure: the height limit and the ring of protected open space around the city mean development pressure concentrates on infill and adaptive reuse parcels where every foot of height and every square foot of site area is already committed. Because requirements track the permit submittal date, a slipped submittal can change what the project has to meet.

What plan-check issues are common in Boulder?

Energy compliance produces most Boulder findings, and they tend to be structural to the design rather than cosmetic. A set that carries gas heating, gas water heating, or gas cooking into a new building conflicts with the all-electric requirement, and swapping to heat pumps late changes service size, panel schedules, equipment room dimensions, and roof or yard space for outdoor units. ERI and EUI submissions get returned when the model inputs and the drawings disagree on glazing area, assembly R-values, infiltration, or equipment efficiency. Envelope detailing gets scrutinized because the performance target is difficult to reach with thermal bridging at slab edges, balconies, parapets, and shelf angles left unaddressed. Height is the site-level failure: massing developed without the city limit produces a scheme that cannot be built as drawn. Flash flooding along Boulder Creek and its tributary drainages is a genuine hazard in this valley, so floodplain elevations, equipment placement, and site drainage need to be reconciled on affected parcels. Applying county requirements to a city site, or the reverse, is a recurring and avoidable error.

Boulder Construction Conditions
All-electric requirement for new construction under the 2024 CoBECC
ERI/EUI energy-compliance documentation required at permit application
Moved to the 2024 ICC suite effective Aug. 1, 2025
City limits vs. unincorporated Boulder County are separate jurisdictions
Among the most stringent local energy and green-building standards in the US

What project types does Boulder permit most?

University of Colorado Boulder work brings academic, laboratory, residential, and athletics buildings that combine occupancies and pull lab containment, exhaust, and assembly egress into single submittals. Laboratory and research construction is the hardest project type to reconcile with the energy code, because high ventilation rates, once-through air, and process loads collide with an EUI target, which pushes energy recovery, demand-based ventilation, and containment strategy into the earliest design decisions rather than the last ones. Purpose-built net-zero and all-electric projects arrive with the compliance path already central to the design, and the screening question becomes whether the drawings actually deliver what the model claims. Multifamily carries accessible unit distribution, fire separation, envelope continuity across many repeated conditions, and the all-electric requirement at scale. Adaptive reuse is common given the constrained land supply, and it brings existing building evaluation, change of occupancy analysis, and the question of how far the energy requirements reach into an existing structure.

Top Project Types in Boulder
University (CU Boulder)Net-zero/all-electric buildingsLab and researchMultifamilyAdaptive reuse

What do Boulder teams ask about plan check?

What codes does Boulder currently enforce?

Boulder enforces the 2024 ICC suite, effective August 1, 2025, together with the 2024 City of Boulder Energy Conservation Code, effective December 1, 2024. Planning and Development Services administers both. Requirements are set by the permit submittal date, so a project whose submittal shifts across an effective date can be subject to a different package than it was designed to meet.

Does Boulder require new buildings to be all-electric?

Yes. The 2024 CoBECC requires new construction to be all-electric with limited exceptions, so gas heating, gas water heating, and gas cooking generally come off the design. The consequences reach further than equipment selection: electrical service size, panel capacity, equipment room dimensions, and space for outdoor heat pump units all change, which is why the decision belongs at schematic design rather than at permit.

What ERI or EUI documentation does Boulder require at permit application?

Energy compliance runs through ERI or EUI paths with the supporting documentation submitted at permit application rather than afterward. That means the energy model, envelope assemblies, glazing ratios, infiltration assumptions, and equipment efficiencies all have to agree with the drawings at the time of submittal. A model that assumes better performance than the sheets show is one of the more common Boulder corrections.

Is my site inside Boulder city limits or in Boulder County?

It is worth confirming before design begins, because the city and unincorporated Boulder County are separate jurisdictions with different adopted requirements and different reviewers, and the boundary is not always intuitive on the ground. A set prepared to city energy requirements for a county parcel, or the reverse, wastes a full cycle. Verify the jurisdiction with the address rather than by assumption.

How does Boulder's height limit affect building design?

The city's charter height limit caps building height in a way most Front Range jurisdictions do not, which constrains massing directly. Combined with the protected open space surrounding the city and the resulting pressure on infill parcels, projects tend to be tight on both height and site area. Establish the limit and the site constraints before the scheme develops, since a height problem is a design problem rather than a detail correction.

How does Helonic help with Boulder's energy requirements?

Helonic reads the drawings against the 2024 ICC suite and the 2024 CoBECC, checking whether the mechanical and plumbing sheets are actually all-electric, whether the electrical service and panels support that change, whether the drawn assemblies and glazing match the ERI or EUI submission, and where thermal bridging or height and floodplain constraints create exposure, citing each item to a sheet. Helonic is a screening tool. The licensed Engineer of Record retains design responsibility, and Boulder Planning and Development Services retains approval authority.

Related Reading

More cities in Colorado

Ready to AI-Review Your Boulder Project?

Upload a drawing set and see what AI plan check surfaces against 2024 ICC suite of codes (effective August 1, 2025) plus the 2024 City of Boulder Energy Conservation Code (CoBECC, effective December 1, 2024) and the planning & development services enforces one of the most aggressive energy codes in the country - the 2024 cobecc requires new buildings to be all-electric (limited exceptions) and uses eri/eui compliance paths; design requirements are set by permit submittal date - before you submit to the City of Boulder Planning & Development Services.