Title 24×Plumbing

Title 24 Plumbing compliance check

Helonic checks plumbing construction drawings against California Title 24 Energy Code (Part 6) to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.

About California Title 24 Energy Code (Part 6)

California's Building Energy Efficiency Standards - the most stringent energy code in the US. Covers building envelope, HVAC, lighting, and solar-ready requirements. All-electric requirements for many building types since 2023.

Scope

Energy efficiency for all new construction and major renovations in California

Editions

2022 Title 24 Part 6 (current), 2019

Applicability

Mandatory for all construction in California. Exceeds IECC requirements significantly. National influence on energy code development.

What we check for

Title 24 compliance checking for plumbing drawings
Cross-reference plumbing details against California Title 24 Energy Code (Part 6) requirements
Verify plumbing specifications meet Title 24 minimum standards
Check plumbing coordination against Title 24 referenced standards
Identify plumbing issues that could cause Title 24 compliance failures
Review plumbing drawings for common Title 24 violations

Common Plumbing issues we catch

Plumbing supply, drainage, venting, medical gas, and fire suppression water supply drawings.

!
Drainage slope and sizing errors
!
Vent system termination and sizing issues
!
Fixture count vs occupancy mismatch
!
Backflow prevention device omissions
!
Water heater clearance and venting errors
!
Grease interceptor sizing deficiencies
!
Cross-connection control violations

Why Title 24 Plumbing compliance matters

California Title 24 Energy Code (Part 6) compliance for plumbing drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching Title 24 plumbing issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).

How Helonic checks Title 24 compliance

1

Upload your PDF drawings

Upload your plumbing PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.

2

Purpose-built construction AI

Helonic's AI is trained specifically to review construction drawings against Title 24 requirements. Domain-specific training catches issues that generic AI tools miss.

3

Exact issue locations

Every Title 24 compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.

4

One-click RFI generation

Turn detected Title 24 issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.

Related resources

Title 24 checks for other disciplines

Plumbing checks against other codes

Check your plumbing drawings against Title 24

Upload your PDF drawings and our AI checks them for California Title 24 Energy Code (Part 6) compliance, automatically.