IMC×Architectural

IMC Architectural compliance check

Helonic checks architectural construction drawings against International Mechanical Code to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.

About International Mechanical Code

The model mechanical code for HVAC systems, exhaust, duct construction, hydronic systems, and refrigeration. Covers all mechanical systems not in the IPC or NEC scope.

Scope

Mechanical and HVAC systems in all building types

Editions

2021 IMC (current), 2018, 2015

Applicability

Adopted in most US jurisdictions alongside the IBC.

What we check for

IMC compliance checking for architectural drawings
Cross-reference architectural details against International Mechanical Code requirements
Verify architectural specifications meet IMC minimum standards
Check architectural coordination against IMC referenced standards
Identify architectural issues that could cause IMC compliance failures
Review architectural drawings for common IMC violations

Common Architectural issues we catch

Architectural drawings including floor plans, elevations, sections, details, and interior finishes.

!
Occupancy classification errors
!
Egress path and exit width deficiencies
!
Fire-rating discontinuities at walls and floors
!
Door and hardware schedule mismatches
!
Finish schedule conflicts
!
Accessibility route and clearance violations
!
Building height and area limit exceedances

Why IMC Architectural compliance matters

International Mechanical Code compliance for architectural drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching IMC architectural issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).

How Helonic checks IMC compliance

1

Upload your PDF drawings

Upload your architectural PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.

2

Purpose-built construction AI

Helonic's AI is trained specifically to review construction drawings against IMC requirements. Domain-specific training catches issues that generic AI tools miss.

3

Exact issue locations

Every IMC compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.

4

One-click RFI generation

Turn detected IMC issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.

Related resources

IMC checks for other disciplines

Architectural checks against other codes

Check your architectural drawings against IMC

Upload your PDF drawings and our AI checks them for International Mechanical Code compliance, automatically.