Helonic checks electrical construction drawings against Florida Building Code to detect violations, missing requirements, and code compliance issues before they delay a permit or hit the field.

About Florida Building Code

Florida's state building code with the most stringent wind and hurricane resistance requirements in the continental US. Includes the High-Velocity Hurricane Zone (HVHZ) provisions for Miami-Dade and Broward counties.

Scope

All construction in Florida

Editions

7th Edition FBC (2023), 6th Edition

Applicability

Mandatory for all construction in Florida. Miami-Dade HVHZ adds additional requirements.

What we check for

FBC compliance checking for electrical drawings
Cross-reference electrical details against Florida Building Code requirements
Verify electrical specifications meet FBC minimum standards
Check electrical coordination against FBC referenced standards
Identify electrical issues that could cause FBC compliance failures
Review electrical drawings for common FBC violations

Common Electrical issues we catch

Electrical power distribution, lighting, fire alarm, low-voltage, and communications drawings.

!
Panel schedule circuit count and load calculation errors
!
Working clearance violations at electrical equipment (NEC 110.26)
!
Missing arc flash labels and hazard analysis
!
Grounding and bonding continuity gaps
!
Emergency/standby power system sizing errors
!
Fire alarm device spacing and coverage gaps
!
Lighting power density exceedances

Why FBC Electrical compliance matters

Florida Building Code compliance for electrical drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching FBC electrical issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).

How Helonic checks FBC compliance

1

Upload your PDF drawings

Upload your electrical PDF drawings. No BIM models or 3D software required. Helonic works with the 2D PDFs your team already uses.

2

Purpose-built construction AI

Helonic's AI is trained specifically to review construction drawings against FBC requirements. Domain-specific training catches issues that generic AI tools miss.

3

Exact issue locations

Every FBC compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.

4

One-click RFI generation

Turn detected FBC issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.

Related resources

FBC checks for other disciplines

Electrical checks against other codes

Check your electrical drawings against FBC

Upload your PDF drawings and our AI checks them for Florida Building Code compliance, automatically.