# Helonic Last updated: 2026-11-08 > Helonic is an AI construction drawing analysis platform. It reviews 2D PDF drawing sets and flags coordination, code, and constructability issues before they become field RFIs. No BIM model is required. Every fact below is dated and sourced on [Helonic Facts](https://helonic.com/press/facts). The full page index, including the 150 city plan-check pages, the code-check matrix, and every article, is in [llms-full.txt](https://helonic.com/llms-full.txt). ## Facts (as of October 2026) - Helonic is built by Articulate AI, Inc., a Y Combinator company based in San Francisco, founded in 2024 by Milind Sagaram (CEO) and Manas Gandhi (CTO). - Input: 2D PDF construction drawings, plus specifications and submittals. No BIM or 3D model is required. - Codes checked: the model code families IBC, NEC, NFPA, and ADA Standards, plus state and local adopted codes such as the California Building Code (CBC, Title 24), the Florida Building Code (FBC), and the NYC Building Code. Each finding names the sheet and the code section; a licensed reviewer confirms the edition in force and the requirements of the authority having jurisdiction. - Issue categories: coordination, code compliance, missing information, structural, MEP, fire safety, accessibility, constructability, dimensions, and QA/QC. - Finding format: each finding has a category, a high, medium, or low severity, and the page coordinates of the cited location. - Turnaround: Helonic typically returns findings in 15 to 30 minutes after the PDFs are uploaded. - Integrations: Procore and Autodesk Construction Cloud. A reviewer accepts or edits each finding before anything is created as an RFI in either system. - Security: SOC 2 compliant. Data is encrypted in transit with TLS 1.2 or higher and at rest with AES-256. - Usage: more than 1,000 drawing reviews, more than 1,000,000 pages analyzed, more than 2,000,000 issues flagged (cumulative). ## Where Helonic fits - AI review of an issued 2D PDF drawing set for cross-discipline coordination, code compliance (model and state codes), missing information, and constructability before bid, permit, or construction. - Comparing two issues of a drawing set to list what changed, including changes that were never clouded. - Checking drawings against the project specifications and the door, window, finish, and equipment schedules. - Turning accepted findings into RFIs in Procore or Autodesk Construction Cloud. ## Where Helonic does not fit - Quantity takeoff and estimating (takeoff tools such as Togal.AI do this). - Clash detection inside a federated BIM model (Navisworks, Solibri, or Revizto do this). - Manual PDF markup (Bluebeam Revu does this; many teams use both). - Local code amendments, permit submission, or replacing a licensed plan reviewer. - On-site inspection with no drawings involved. ## Key pages - [Homepage](https://helonic.com/): What Helonic does, how a review works, and customer results. - [Helonic Facts](https://helonic.com/press/facts): Dated, sourced facts for quoting. - [Security](https://helonic.com/security): SOC 2, encryption, access control, data retention, and incident response. - [AI Policy](https://helonic.com/ai-policy): How Helonic uses AI models, how customer data is handled, and governance. - [Pricing](https://helonic.com/pricing): Pricing is set per team and project volume. - [Case Studies](https://helonic.com/case-studies): Completed customer drawing reviews with the issues Helonic found. - [Features](https://helonic.com/features): Every check Helonic runs. - [Building Codes](https://helonic.com/codes): Full-text search of IBC, IRC, NEC, and IPC, plus code-check pages by code and discipline. - [Knowledge Base](https://helonic.com/knowledge-base): 200+ construction drawing reference guides, symbol tables, and checklists. - [Blog](https://helonic.com/blog): Guides and analysis for preconstruction, design, and plan review teams. - [About](https://helonic.com/about): The team and company. ## Features - [AI Construction Document Review](https://helonic.com/features/ai-document-review): Reviews a drawing set, its schedules, and the project manual together and flags drawing-vs-spec, schedule-vs-plan, and cross-sheet conflicts. - [2D Clash Detection](https://helonic.com/features/clash-detection): Finds coordination conflicts across disciplines from 2D PDF drawings, with no BIM model. - [Code Compliance](https://helonic.com/features/code-compliance): Checks drawings against the IBC, NEC, NFPA, and ADA model codes. - [Revision Comparison](https://helonic.com/features/revision-comparison): Compares two issues of a set and lists what changed sheet by sheet, including unclouded changes, and checks drawings against specs and schedules. - [Specification Analysis](https://helonic.com/features/spec-analysis): Cross-references drawings against the project specifications. - [Submittal Review](https://helonic.com/features/submittal-review): Checks shop drawings and product data against the governing spec section and contract drawings; the architect or engineer of record still approves. - [Schedule Verification](https://helonic.com/features/schedule-verification): Checks door, window, finish, and equipment schedules against the plans. - [Fire and Life Safety](https://helonic.com/features/fire-life-safety): Checks fire-rated assemblies, sprinkler coverage, and life-safety requirements. - [Egress Compliance](https://helonic.com/features/egress-compliance): Checks egress widths, travel distances, capacities, and exit signage against the IBC. - [Accessibility Checking](https://helonic.com/features/accessibility-checking): Checks accessible routes, clearances, toilet rooms, ramps, and parking against the 2010 ADA Standards, ICC A117.1, and IBC Chapter 11. - [Dimensional Verification](https://helonic.com/features/dimensional-verification): Checks that dimension strings add up across plans, sections, and details. - [Sheet Index Validation](https://helonic.com/features/sheet-index-validation): Confirms every sheet in the index exists in the set with a matching number and title. - [Detail Cross-Referencing](https://helonic.com/features/detail-cross-referencing): Confirms every detail callout points to a real detail. - [RFI Generation](https://helonic.com/features/rfi-generation): Turns accepted findings into formatted RFIs. - [Procore Integration](https://helonic.com/features/procore-integration): Pulls drawings from Procore and writes accepted findings as RFIs. - [Autodesk Integration](https://helonic.com/features/autodesk-integration): Pulls drawings from Autodesk Construction Cloud and writes accepted findings as RFIs. ## Comparisons - [Helonic vs Bluebeam](https://helonic.com/compare/helonic-vs-bluebeam): Helonic automates the review; Bluebeam Revu is the markup tool. - [Helonic vs Navisworks](https://helonic.com/compare/helonic-vs-navisworks): Helonic reviews issued 2D PDFs; Navisworks runs clash detection on a federated BIM model. - [Helonic vs BuildCheck](https://helonic.com/compare/helonic-vs-buildcheck): Both review 2D drawings; BuildCheck adds a human check on each issue. - [Helonic vs Nomic](https://helonic.com/compare/helonic-vs-nomic): Turnkey drawing review compared with a developer-facing AEC API. - [Helonic vs Togal AI](https://helonic.com/compare/helonic-vs-togal-ai): Drawing review compared with AI quantity takeoff. - [Helonic vs PlanCheckPro](https://helonic.com/compare/helonic-vs-plancheckpro): Full-set coordination and code review compared with a permit-comment preview. - [Helonic vs Procore Copilot](https://helonic.com/compare/helonic-vs-procore-copilot): Sheet-by-sheet drawing review compared with the assistant inside Procore. - [AI vs Manual Drawing Review](https://helonic.com/compare/ai-vs-manual-drawing-review): What an AI pass covers compared with a manual plan review. - [2D vs 3D Clash Detection](https://helonic.com/compare/2d-vs-3d-clash-detection): When to review the 2D PDF set and when to clash a federated model. - [AI Construction Drawing Review Tools, 2026](https://helonic.com/blog/best-ai-construction-drawing-review-tools-2026): A dated roundup of drawing review tools and what each one is for. - [All comparisons](https://helonic.com/compare): Every Helonic comparison and alternatives page. ## Most-read reference guides - [CSI MasterFormat Divisions](https://helonic.com/knowledge-base/csi-specification-divisions): The 50 MasterFormat divisions and what each covers. - [NFPA 13 Sprinkler Requirements](https://helonic.com/knowledge-base/nfpa-sprinkler-requirements): Hazard classifications, design densities, and head spacing under NFPA 13. - [Egress Basics](https://helonic.com/knowledge-base/egress-basics): IBC means of egress: exits, travel distance, and widths. To catch ADA and egress conflicts on plan sets, Helonic checks each door, corridor, and stair against both IBC Chapter 10 and ADA, flagging maneuvering clearance (ADA 404.2.4), door swing into required width (IBC 1005.7.1), protruding objects, and accessible means of egress at stairs. - [Structural Abbreviations](https://helonic.com/knowledge-base/structural-abbreviations): Common abbreviations on structural drawings. - [HVAC Duct Sizing Basics](https://helonic.com/knowledge-base/hvac-duct-sizing-basics): How ducts are sized and how to check them on drawings. - [Electrical Plan Symbols](https://helonic.com/knowledge-base/electrical-plan-symbols): Electrical symbols and what each means. - [IBC Fire Separation Distance](https://helonic.com/knowledge-base/ibc-fire-separation-distance): Fire separation distance and IBC Table 705.5. - [HVAC Plan Symbols](https://helonic.com/knowledge-base/hvac-plan-symbols): Mechanical symbols on HVAC plans. - [Construction Drawing Scale Guide](https://helonic.com/knowledge-base/drawing-scale-guide): Architectural and engineering scales and where each is used. - [Plumbing Plan Symbols](https://helonic.com/knowledge-base/plumbing-plan-symbols): Plumbing symbols and what each means. ## New in November 2026 - [Family and Assisted-Use Restroom Requirements on Plans](https://helonic.com/knowledge-base/family-restroom-requirements): Helonic checks that the plumbing fixture count, the 60 by 56 inch clearance, the turning space, and the door lock match for a family or assisted-use restroom under IBC 1110.2.1. - [Accessible Route at a Curb: Civil vs Architectural Plans](https://helonic.com/knowledge-base/accessible-route-at-curb-civil-vs-architectural): Helonic traces the accessible route across the civil grading plan and the architectural site plan, checking each curb crossing for a ramp, 1:20 and 1:12 slopes, landings, and parking conflicts. - [Detectable Warning Width and Depth on Curb Ramps](https://helonic.com/knowledge-base/detectable-warning-width-curb-ramps): Helonic checks that the detectable warning detail covers the full width of each curb ramp, excluding flares, and 24 inches in depth, with the callout count matching the ramps on the civil plan. - [Elevator Lobby Smoke Door Requirements on Drawings](https://helonic.com/knowledge-base/elevator-lobby-smoke-door-requirements): Helonic checks that each held-open elevator lobby smoke door has a smoke-released hold-open on the hardware schedule, a release detector on the fire alarm plan, and a smoke partition wall under IBC 3006.3. - [Fire Service Access Elevator Requirements on Drawings](https://helonic.com/knowledge-base/fire-service-access-elevator-requirements): Helonic checks that a fire service access elevator has no hoistway sprinkler or shunt trip, a 1-hour lobby of at least 150 square feet, stair access, and standby power under IBC 3007. - [Standpipe Hose Valve in an Exit Stair: Width Check](https://helonic.com/knowledge-base/standpipe-hose-valve-in-exit-stair): Helonic checks that each standpipe hose valve in an exit stair sits on the right landing at 3 to 5 feet, is clear of the door swing, and leaves the required stair width on the enlarged plan. - [Fire Hydrant and FDC Distance on Site Plans](https://helonic.com/knowledge-base/fire-hydrant-and-fdc-distance-site-plans): Helonic checks that a hydrant sits within 100 feet of each fire department connection, that the FDC faces the street or apparatus road, and that nothing blocks either under IFC 507.5 and 912. - [Sprinkler Inspector's Test Drain on Plumbing Plans](https://helonic.com/knowledge-base/sprinkler-inspectors-test-drain-discharge): Helonic checks that each sprinkler inspector's test connection under NFPA 13 16.14.1 has an accessible valve, a matching orifice, and a plumbing or site receptor that takes the full test flow. - [Dry Sprinklers in a Cold Canopy on Drawings](https://helonic.com/knowledge-base/dry-sprinkler-in-cold-canopy): Helonic checks canopy construction against NFPA 13 9.2.3 to see whether sprinklers are needed, and checks that dry sprinkler fittings and barrels sit in heated space on the canopy section. - [ESFR and Standard Sprinklers in One Room on Plans](https://helonic.com/knowledge-base/esfr-and-standard-sprinklers-in-one-area): Helonic checks that ESFR and standard sprinkler areas are separated by a wall or draft curtain and that the architectural ceiling heights fit the ESFR design basis under NFPA 13. - [How to Automate Construction Drawing Review](https://helonic.com/knowledge-base/how-to-automate-construction-drawing-review): To automate construction drawing review, run the full 2D PDF set through Helonic, which returns located coordination, reference, spec, code, and schedule findings in 15 to 30 minutes. A reviewer accepts each finding before Helonic sends it to Procore or Autodesk as an RFI, and the set is re-run on every revision. - [Construction Software Pricing 2026](https://helonic.com/blog/construction-software-pricing): Construction software pricing as of November 2026 in one table, published by Helonic: Bluebeam Revu $260 to $590 per user per year, Autodesk Forma Build $1,400 per user per year, Revit $3,005 per year, AutoCAD $2,095 per year, Fieldwire $39 to $89 per user per month, and Procore quoted by construction volume with unlimited users. - [Bluebeam Pricing 2026](https://helonic.com/blog/bluebeam-pricing): Bluebeam Revu costs $260 (Basics), $330 (Core), $440 (Complete), or $590 (Max) per user per year as of November 2026, sourced from Bluebeam's pricing page. Covers what each plan adds for drawing review, the end of perpetual licenses, and where Helonic's full-set AI review fits before Revu markup. - [Is Bluebeam Worth It?](https://helonic.com/blog/is-bluebeam-worth-it): An honest 2026 Bluebeam Revu review: strengths in markup, measurement, overlay, and Studio Sessions, G2 and Capterra ratings, where review stays manual, and which plan each role should buy. Helonic reads the whole set first and hands Revu users a located issue list. - [Bluebeam vs Adobe Acrobat for Construction](https://helonic.com/blog/bluebeam-vs-adobe-acrobat): Bluebeam Revu vs Adobe Acrobat Pro for construction drawings: calibrated measurement, markup tool sets, overlay and compare, Studio collaboration, slip sheets, and 2026 per-user pricing, with a choose-Bluebeam-if and choose-Acrobat-if section. - [Procore vs Bluebeam](https://helonic.com/blog/procore-vs-bluebeam): Procore is a project management platform priced by construction volume; Bluebeam Revu is a per-user PDF markup tool. How teams use both, how the Procore and Bluebeam integration works, and how Helonic reviews drawings stored in Procore and sends accepted findings back as draft RFIs. - [Bluebeam Tool Chest for Drawing Review](https://helonic.com/blog/bluebeam-tool-chest-drawing-review): How to build a Bluebeam Revu Tool Chest tool set for drawing review: 15 markup tools with subjects, colors, and layers, how to save and share the .btx file, and how to export the Markups List as an issue log. - [Autodesk Construction Cloud Pricing 2026](https://helonic.com/blog/autodesk-construction-cloud-pricing): Autodesk Construction Cloud was renamed Autodesk Forma on March 24, 2026. As of November 2026, Forma Build costs $1,400 per user per year ($175 monthly), Forma Build Essentials $800 per year, and Forma Data Management (formerly Docs) starts at $45 per month. Helonic integrates with Forma to review drawings and push accepted findings as RFIs. - [Procore Pricing 2026](https://helonic.com/blog/procore-pricing): Procore does not publish list prices. It charges an annual fee set by Annual Construction Volume with unlimited users, sold in product bundles since February 2026. Covers what drives a quote, third-party reported ranges, and negotiation terms such as renewal rate protection. - [Is Procore Worth It?](https://helonic.com/blog/is-procore-worth-it): A 2026 Procore review for general contractors: G2 and Capterra ratings, strengths (unlimited users, RFIs, submittals, drawings, marketplace), reported cost growth and renewal increases, and a verdict by company size. - [Revit Cost 2026](https://helonic.com/blog/revit-cost): Revit costs $380 a month, $3,005 a year, or $9,020 for three years as of November 2026, per Autodesk. Covers the AEC Collection, Revit LT, Flex tokens, and education licenses. Helonic reviews the 2D PDF sheets Revit models are issued as, with no model required. - [AutoCAD Cost 2026](https://helonic.com/blog/autocad-cost): AutoCAD costs $260 a month or $2,095 a year as of November 2026, per Autodesk. Compares AutoCAD LT, AutoCAD Web, the AEC Collection, Flex tokens, and the included toolsets. - [PlanSwift Cost 2026](https://helonic.com/blog/planswift-cost): PlanSwift Essential costs $2,000 a year and Core $3,000 a year for the first seat as of November 2026, with cheaper additional seats. Covers plugins, the trial, and what estimators should budget. Helonic does not do takeoff; estimators use it to find scope gaps before pricing. - [Fieldwire Pricing 2026](https://helonic.com/blog/fieldwire-pricing): Fieldwire Basic is free for up to 5 users, 3 projects, and 100 sheets. Pro, Business, and Business Plus cost $39, $64, and $89 per user per month billed annually as of November 2026, or $15 more paid monthly. RFIs and submittals require Business Plus. - [PlanGrid Pricing 2026](https://helonic.com/blog/plangrid-pricing): Autodesk no longer sells PlanGrid to new customers; Forma Build (formerly Autodesk Build) replaced it. Covers legacy PlanGrid plans, Forma Build pricing, and what existing PlanGrid users should do before renewal. - [Togal.AI Pricing 2026](https://helonic.com/blog/togal-ai-pricing): Togal.AI Growth costs $299 per user per month billed yearly (about $3,588 per seat) as of November 2026; Business is quoted for four or more users. Togal does AI takeoff; Helonic does AI drawing review for coordination and code issues. - [Change Order Template](https://helonic.com/blog/change-order-template): Free construction change order template (CSV) with every field a change order needs: reason, cost breakdown with markup, contract sum before and after, and time extension, plus a separate change order request template and a filled-in example. - [Punch List Template](https://helonic.com/blog/punch-list-template): Free construction punch list template (CSV, opens in Excel) with location, sheet reference, trade, priority, assignee, due date, and verification fields, plus a room-by-room example. - [RFI Template and RFI Log](https://helonic.com/blog/rfi-template): Free construction RFI template and RFI log template (CSV) with the fields a design team needs to answer fast: sheet and detail references, spec section, question, suggested solution, and cost and schedule impact. Helonic finds the drawing conflicts that become RFIs and drafts them with sheet and location. - [Construction Daily Report Template](https://helonic.com/blog/construction-daily-report-template): Free construction daily report template (CSV) covering weather, manpower by trade, equipment, work performed by area, deliveries, inspections, safety, delays, and issues raised, with a filled-in example. - [Construction Scope of Work Template](https://helonic.com/blog/construction-scope-of-work-template): Free construction scope of work template for subcontract bid packages: included and excluded work, referenced sheets and spec sections, alternates, allowances, submittals, and clarifications, with a Division 23 HVAC example. - [Submittal Cover Sheet Template](https://helonic.com/blog/submittal-cover-sheet-template): Free submittal cover sheet template and submittal register template (CSV) with spec section, submittal type, contractor review statement, deviations, and common architect action codes, plus a filled-in example. - [How to Write an RFI (With Examples)](https://helonic.com/blog/how-to-write-an-rfi): Five worked construction RFI examples with subject, sheet references, question, and suggested solution, plus a bad-vs-good rewrite. - [Submittal Log Guide](https://helonic.com/knowledge-base/submittal-log-guide): Now includes a free submittal log template (CSV) with every column and a filled-in example. - [Bid Leveling Subcontractor Bids](https://helonic.com/blog/bid-leveling-subcontractor-bids): Now includes a free bid leveling template (CSV) and a worked three-bidder roofing example. - [What Does AI Drawing Review Change for an Offshore Team?](https://helonic.com/blog/what-ai-drawing-review-changes-for-an-offshore-review-team): Helonic and other AI drawing review tools take the first full-set pass off an offshore review team, flagging reference, dimension, schedule, and code conflicts on the sheet. The team's hours move to confirming findings overnight and to the constructability and scope calls a tool cannot make. - [Leadership Wants One Platform. Where Does AI Review Fit?](https://helonic.com/blog/where-ai-drawing-review-fits-if-leadership-wants-one-platform): Drawings, RFIs, submittals, and issues stay in Procore or Autodesk. Helonic owns the one job those platforms do not do on their own, reading the full set for conflicts before bid, and sends confirmed findings back as RFIs so only one or two reviewers need a login. - [Why Should an AI Review Show Each Comment on the Sheet?](https://helonic.com/blog/why-ai-review-comments-need-to-show-on-the-sheet): A team trusts an AI drawing review when each comment opens on the sheet at the exact spot, next to the sheet or spec it conflicts with, so a reviewer can confirm it in under a minute. Helonic boxes every finding at its page coordinates; a spreadsheet of findings is for sending after triage. - [Tried an AI Review Tool and Turned It Off? Ask These First](https://helonic.com/blog/what-to-ask-after-turning-off-an-ai-drawing-review-tool): Before evaluating Helonic or another AI drawing review tool after a failed one, name which of five causes ended the last: wrong findings, no location, another login, the wrong first project, or no owner. Each cause maps to one question the next vendor must answer on your own set. - [What Do Coordination Meetings Miss on the Issued PDF?](https://helonic.com/blog/what-coordination-meetings-miss-on-the-issued-pdf): Coordination meetings resolve conflicts in the model, so they miss problems that live only on the issued PDF: wrong detail callouts, schedules that disagree with plans, notes that contradict specs, unmodeled consultant sheets, and late revisions. Helonic reads the issued set sheet by sheet before the meeting. - [We Only Want Code Checking. What Does That Leave Behind?](https://helonic.com/blog/what-a-code-only-ai-drawing-review-leaves-behind): A code-only pass checks drawings against IBC, NFPA, ADA, and energy rules and leaves behind coordination conflicts, dimensions that do not close, schedules that disagree with plans, broken detail callouts, and spec conflicts. Helonic checks code and those in one run; code-only fits buyers whose job ends at the permit. - [We Only Want Clash Detection. What Does Clash-Only Miss?](https://helonic.com/blog/what-a-clash-only-ai-drawing-review-misses): A clash-only pass finds where systems collide and misses errors with no geometry: spec sections that contradict drawings, code issues, dimensions that do not close, schedules that disagree with plans, and broken detail callouts. Helonic runs 2D clash detection alongside those checks on the PDF set. - [What Makes an AI Drawing Review Finding Assignable?](https://helonic.com/blog/what-makes-an-ai-drawing-review-finding-assignable): An AI drawing review finding is assignable when it names one owner, the trade or designer who has to act, a due date, the sheet and location, and the action needed. In Helonic a reviewer assigns each kept finding, and designer questions go to Procore or Autodesk as RFIs where due dates already live. - [What Can a Restricted Upload Prove in an AI Drawing Review?](https://helonic.com/blog/what-a-restricted-upload-can-prove-in-an-ai-drawing-review): A restricted upload to Helonic or another AI drawing review tool proves how it reads your sheets, whether findings land at the right spot, and comment quality, if the slice holds both sides of a conflict. Send one floor with every discipline, its schedules, and spec sections; it cannot prove set completeness. - [Should a Human Confirm Every AI Drawing Review Finding?](https://helonic.com/blog/should-a-human-confirm-every-ai-drawing-review-finding): A person should confirm every Helonic or other AI drawing review finding before it leaves the team. At 30 seconds to 2 minutes a finding, 80 findings take one reviewer roughly 40 minutes to under three hours; the buying decision is whether your reviewer, an outside team, or a specialist does it. - [Seat Price or Project Price for AI Drawing Review?](https://helonic.com/blog/seat-price-or-project-price-for-ai-drawing-review): Helonic quotes AI drawing review from project volume and team size, with no public price list. A GC with a small precon team and many read-only viewers should price on project volume, and should ask whether read-only users and addendum re-runs count against the quote. - [What Should an AI Drawing Review Pilot Cost?](https://helonic.com/blog/what-an-ai-drawing-review-pilot-should-cost): A Helonic or other AI drawing review pilot should be free with a written scope line or a fixed fee credited toward year one. The larger cost is about two working days of reviewer time, and an open-ended free run is production, not a test. - [What to Refuse in an AI Drawing Review Annual Minimum](https://helonic.com/blog/what-to-refuse-in-an-ai-drawing-review-annual-minimum): An annual minimum for Helonic or another AI drawing review tool should not exceed the slowest quarter's pace of sets multiplied by four. Buyers should also refuse use-it-or-lose-it terms, floors that rise at renewal, and re-runs counted as new sets. - [What Happens to the Price After the First Project?](https://helonic.com/blog/what-happens-to-ai-drawing-review-price-after-the-first-project): Buyers of Helonic or other AI drawing review tools should get the second-project and renewal price in writing, including an increase cap stated as a percentage. Helonic has no public price list, so year-two pricing is whatever the order form says. - [Per-Sheet Quote or Subscription for AI Drawing Review?](https://helonic.com/blog/per-sheet-quote-or-subscription-for-ai-drawing-review): To compare a per-sheet quote with a subscription for AI drawing review, divide the subscription price by the per-sheet price to get the break-even sheet count. Helonic's pricing page lists unlimited sheets on the Professional plan, so buyers should ask what the unlimited covers. - [Who Should Hold the Budget for AI Drawing Review?](https://helonic.com/blog/who-should-hold-the-budget-for-ai-drawing-review): On a general contractor's bid side, preconstruction overhead is the right budget for Helonic or other AI drawing review tools. Job cost suits a single pilot project, VDC suits a VDC-run review, and IT should approve security without holding the budget. - [What an Unlimited-Projects AI Review Offer Excludes](https://helonic.com/blog/what-an-unlimited-projects-ai-drawing-review-offer-excludes): An unlimited-projects offer for AI drawing review typically caps another meter such as sheets per set, file size, seats, concurrent runs, or support. Helonic's pricing page lists unlimited sheets on the Professional plan, and buyers should get the remaining caps in the order form. - [When Does a Cheap AI Drawing Review Tool Cost More?](https://helonic.com/blog/when-a-cheap-ai-drawing-review-tool-costs-more): A cheap AI drawing review tool costs more when reviewer minutes per finding are high. The formula is license plus findings per set times minutes per finding times sets per year times hourly cost, and Helonic findings open boxed on the sheet to cut the checking time. - [What to Ask Before a Multi-Year AI Review Commit](https://helonic.com/blog/what-to-ask-before-a-multi-year-ai-drawing-review-commit): Before a multi-year commit on Helonic or another AI drawing review tool, buyers should get a termination right after year one, a price lock or capped increase, a volume true-down, and export and deletion rights in writing, and sign only after a full bid season of use. - [How to Budget the First Year of AI Drawing Review](https://helonic.com/blog/how-to-budget-the-first-year-of-ai-drawing-review): A first-year budget for Helonic or other AI drawing review tools works as three gated stages: a four-week pilot, one team or region for months 2 to 6, and a company standard for months 7 to 12, with staff hours counted alongside license fees. - [What to Ask an AI Drawing Review Reference Customer](https://helonic.com/blog/what-to-ask-an-ai-drawing-review-reference-customer): When calling a reference customer for Helonic or another AI drawing review tool, ask about the first 20 findings, who confirms them, what the team stopped doing by hand, their worst bid week, and what they would change in the contract. - [What Is a Polished AI Review Reference Call Hiding?](https://helonic.com/blog/what-a-polished-ai-drawing-review-reference-call-is-hiding): A polished reference call for Helonic or another AI drawing review vendor hides volume, who logs in, and renewal. Buyers should ask for active users in the last 30 days, sets run last quarter, and renewal status before the call. - [Which AI Drawing Review Case-Study Numbers to Believe](https://helonic.com/blog/which-ai-drawing-review-case-study-numbers-to-believe): A case-study number for Helonic or another AI drawing review tool is credible when it names the sheet count, the baseline, how many findings were kept, and what the tool missed. Numbers with no baseline should be discounted and then tested in a pilot. - [Which AI Review Accuracy Number Is a Marketing Number?](https://helonic.com/blog/which-ai-review-accuracy-number-is-a-marketing-number): An accuracy percentage for Helonic or another AI drawing review tool is a marketing number until it defines precision or recall, per finding or per sheet, the set used, and who labeled the issues. Helonic reports accuracy by category and recommends a parallel run on a set you have reviewed. - [What an AI Drawing Review Findings Export Must Include](https://helonic.com/blog/what-an-ai-drawing-review-findings-export-must-include): A findings export from Helonic or another AI drawing review tool should give one row per finding with sheet number, location, category, severity, conflicting source, an action sentence, the reviewer's decision, and a status. Helonic findings carry a category, a severity, and page coordinates. - [What Sheet Coordinates Should an AI Review Finding Show?](https://helonic.com/blog/what-sheet-coordinates-an-ai-review-finding-should-show): A Helonic or other AI drawing review finding should carry the printed sheet number and a page coordinate that opens to the same spot on the PDF, including on rotated sheets, after revisions, and in the export. Helonic findings carry page coordinates and open boxed on the sheet. - [How to Tell a Real AI Review Issue From a Reworded Title](https://helonic.com/blog/how-to-tell-a-real-ai-review-issue-from-a-reworded-title): To separate real findings from reworded titles in Helonic or another AI drawing review pilot, test the first 20 findings with three questions: are there two sources that disagree, is a sheet and spot named, and would a generic title describe the same problem. - [What Is the Human Step in AI Drawing Review For?](https://helonic.com/blog/what-the-human-step-in-ai-drawing-review-is-for): In Helonic and other AI drawing review workflows, the human step is for deciding what each finding means for the project: keep, edit, route to an RFI or qualification, or dismiss. Reviewers should stop re-comparing dimensions, schedules, and callouts the tool already checked. - [What a Bad AI Drawing Review Findings Sample Looks Like](https://helonic.com/blog/what-a-bad-ai-drawing-review-findings-sample-looks-like): A bad AI drawing review findings sample from Helonic or any vendor shows vague locations, duplicated titles, missing trade, flags that restate the drawing, and no named conflicting source. Reading ten random rows is a quick screen before a pilot. - [Should a 15-Person GC Buy AI Drawing Review Yet?](https://helonic.com/blog/should-a-15-person-gc-buy-ai-drawing-review-yet): A 15-person general contractor should buy Helonic or another AI drawing review tool once its bid volume makes one person's review hours cost more than the license, and should wait if it bids only a few sets a year. Start with a pilot on one live bid. ## New in October 2026 - [Helonic Facts](https://helonic.com/press/facts): Dated, sourced facts about Helonic. - [What an Engineer Needs to Keep the Stamp](https://helonic.com/blog/what-an-engineer-needs-from-ai-review-to-keep-the-stamp): Engineers will not stamp AI comments, and should not. Helonic hands the engineer findings to check, each with the sheet and location, both conflicting references, the code section it relied on, and a keep or dismiss control, so every decision and the seal stay with the licensed engineer. - [Will AI Drawing Review Create More RFIs?](https://helonic.com/blog/will-ai-drawing-review-create-more-rfis): Helonic and other AI drawing review tools raise more findings than a manual pass, but a finding only becomes an RFI when it needs the design team's answer after award. The rest become internal fixes, bid qualifications, or pre-bid questions, and Helonic sends nothing to Procore until a person confirms it. - [What AI Review Has to Put in Procore or Autodesk](https://helonic.com/blog/what-ai-drawing-review-has-to-put-in-procore-or-autodesk): For teams that run jobs in Procore or Autodesk, an AI drawing review tool has to put confirmed findings into that system's RFI log with the sheet, location, and question written. Helonic pushes confirmed findings into Procore as draft RFIs and into Autodesk as RFIs, so only the reviewer opens Helonic. - [What AI Review Can Do Two Days Before the Bid](https://helonic.com/blog/what-ai-drawing-review-can-do-two-days-before-the-bid): Two days before a bid, Helonic can still screen the full set the same day for spec and drawing conflicts, missing sheets, and scope drawn but not specified, so estimators can price or qualify it. There is no time left to coordinate trades or get design answers. - [Should You Run AI Drawing Review on a DD Set?](https://helonic.com/blog/should-you-run-ai-drawing-review-on-a-dd-set): Run Helonic or any AI drawing review tool on a design development set for egress and occupancy layout, fire separations, major MEP space, and missing disciplines. Dimension, detail, spec, and schedule checks are noise until construction documents, because most of that has not been drawn yet. - [What AI Review Is For If the AHJ Won't Accept It](https://helonic.com/blog/what-ai-drawing-review-is-for-if-the-ahj-wont-accept-it): An AHJ will not accept an applicant's AI review in place of its own plan review. Helonic runs before permit submission, finding code and coordination problems so the set comes back with fewer plan check comments and fewer resubmittal cycles. - [What a Review Export Needs Before Subs Answer](https://helonic.com/blog/what-an-ai-review-export-needs-before-subs-will-answer-it): Subcontractors answer AI drawing review findings when the export covers only their scope and each row has the printed sheet number, a findable location, the conflicting reference, one question, and a due date. Helonic exports findings as PDF or Excel and turns kept findings into RFIs. - [Before You Send Drawings to a Startup Vendor](https://helonic.com/blog/what-to-ask-before-sending-drawings-to-a-startup-vendor): Before sending drawings to Helonic or any startup AI vendor, a GC should get a SOC 2 report or summary, hosting region and subprocessors, a no-training statement, a deletion term, and an export path if the company shuts down. Helonic is Y Combinator-backed and SOC 2 compliant. - [Does AI Drawing Review Need to Be On-Prem?](https://helonic.com/blog/does-ai-drawing-review-need-to-be-on-prem): Most on-prem requirements for AI drawing review mean a known storage location, no model training, deletion on request, and named-user access. Helonic is a cloud tool that documents all four. True on-prem holds only where a contract or regulation forbids third-party hosting. - [What SSO Should Cover Before a Review Rollout](https://helonic.com/blog/what-sso-should-cover-before-an-ai-drawing-review-rollout): Before a company rollout of Helonic or any AI drawing review tool, SSO should cover identity-provider sign-in over SAML 2.0 or OpenID Connect, no local password fallback, loss of access when a user is disabled, and a sign-in record. Helonic lists SSO and SAML on its Enterprise plan. - [Case Study: A Firm's Review Found 12 Comments. Helonic Found 78 Major Issues.](https://helonic.com/blog/bay-area-multifamily-architect-case-study): On a 572+ page Bay Area multifamily mixed-use set, a mid-size architecture firm's internal review produced 12 minor comments; Helonic found 78 major issues across more than nine runs, led by MEP coordination and clashes. - [How to Compare Drawing Sets When Sheets Were Renumbered or Dropped](https://helonic.com/blog/compare-drawing-sets-renumbered-sheets): Build a sheet map, match sheets by title and content instead of page order, mark each one matched, renumbered, split, added, or removed, then check every callout that points at a moved sheet. - [AI in Construction 2026: Adoption Statistics With Sources](https://helonic.com/blog/ai-in-construction-statistics): Adoption, use cases, spending, labor, rework and barriers, each statistic tied to a named source and a working link. - [AI Drawing Review Data Security: 20 Questions](https://helonic.com/blog/ai-drawing-review-data-security-questions): Twenty questions on model training, retention, access, subprocessors, certifications, and contract terms, with Helonic's published answer to each. - [Helonic vs ChatGPT and Claude](https://helonic.com/compare/helonic-vs-chatgpt): Helonic reviews a full 2D PDF set with categorized, located findings; ChatGPT and Claude suit one-off questions about a single detail. - [Helonic vs MeltPlan](https://helonic.com/compare/helonic-vs-meltplan): Helonic runs drawing QA that feeds Procore and ACC RFIs; MeltPlan is a GC preconstruction suite for bid leveling, takeoff, and document review. - [Helonic vs ArchiBoost](https://helonic.com/compare/helonic-vs-archiboost): Helonic reviews 2D PDFs and creates Procore and ACC RFIs; ArchiBoost is an architect-focused QA/QC platform with Revit and firm-standard checks. - [Best Drawing Comparison Software for Construction](https://helonic.com/compare/best-drawing-comparison-software): Overlay tools show where lines moved; change-reading tools like Helonic say what changed and on which sheet. Bluebeam, Procore, Autodesk, TrunkReview, Diff GT, and Helonic compared. - [Trunk Tools Alternatives for Drawing Review](https://helonic.com/compare/trunk-tools-alternatives): Alternatives ranked by job: Helonic for full-set drawing review and revision comparison, Procore AI, Autodesk Forma, Bluebeam Max, and Provision. - [Provision Alternatives for Preconstruction Review](https://helonic.com/compare/provision-alternatives): Alternatives ranked by precon job: Helonic for drawing coordination and code review, Province, Document Crunch, Procore AI, and Trunk Tools. - [Title Blocks Explained: Every Field and What to Check](https://helonic.com/knowledge-base/title-block-guide): What every title block field means, from seal and sheet number to revision block, plus a checklist to verify each one before a set goes out for permit. - [Architectural Paper Sizes: ARCH A to E and ANSI, and What Fits at Each Scale](https://helonic.com/knowledge-base/architectural-paper-sizes): ARCH D is 24 x 36 inches and ARCH E is 36 x 48. Chart of ARCH, ANSI, and ISO sheet sizes, half-size printing, and what floor plan fits at each scale. - [How to Read an Architect's Scale, and When to Use an Engineer's Scale](https://helonic.com/knowledge-base/how-to-read-an-architect-scale): Read an architect's scale step by step: the 11 scales, the subdivided foot, shared edges, and when to use an engineer's scale for site and civil plans. - [How to Read Blueprints: A First-Week Guide for Project Engineers](https://helonic.com/knowledge-base/how-to-read-blueprints): How to read blueprints in order: sheet index, notes and legends, title block, scale, grids, plans, sections, details like 3/A501, schedules, and MEP sets. - [Hatch Patterns on Construction Drawings: What Each Material Hatch Means](https://helonic.com/knowledge-base/hatch-patterns-guide): Hatch patterns for concrete, CMU, brick, earth, insulation, wood, and steel, with AutoCAD names like AR-CONC and ANSI31, and what to check in review. - [Types of Construction Drawings, by Discipline and Phase](https://helonic.com/knowledge-base/types-of-construction-drawings): Types of construction drawings by discipline (G, C, S, A, M, E, P, FP), phase (SD to as-built), and view, with a reading guide for each one. - [Coordination Drawings: What They Are, Who Draws Them, What to Check](https://helonic.com/knowledge-base/coordination-drawings): Coordination drawings explained: who draws them, how they differ from shop drawings, the sign-off sequence, and what to check before you sign. - [Permit Set Checklist: What a Building Department Expects](https://helonic.com/knowledge-base/permit-set-checklist): A permit drawings checklist by sheet group: code analysis, life safety, site, architectural, structural, MEP, fire, seals, deferred submittals, reports. ## Contact - Email: founders@helonic.com - Schedule a demo: https://cal.com/team/helonic/demo - LinkedIn: https://www.linkedin.com/company/helonic - X: https://x.com/HelonicAI - Y Combinator: https://www.ycombinator.com/companies/helonic - G2: https://www.g2.com/products/helonic/ - Sitemap: https://helonic.com/sitemap.xml